I didn’t fight for this flag just to come home and watch politicians destroy everything Americans built. Crime has risen and Washington has done nothing.
If you're ready to fight back, donate now to help me stand for America.
Chip in $5, $10, or whatever you can to strengthen our future and send Alex to Congress!
https://t.co/YMhBabbpNW
San Tan Valley’s rapid growth has brought real traffic challenges but it also presents an opportunity to lead with smart, forward thinking solutions. I’m energized by the chance to champion infrastructure improvements, strategic planning, and community driven policies that ease congestion, strengthen mobility, and enhance quality of life.
We know aligning monetary policy with emerging financial technologies isn’t just adaptive it’s a forward looking strategy for maintaining economic resilience in an era of unprecedented debt.
BREAKING: The U.S. Government has officially announced that @Tesla and LG Energy have signed an agreement to build a $4.3 billion lithium iron phosphate (LFP) prismatic battery cell manufacturing factory in Lansing, Michigan, with a 2027 start of production.
"American-made cells will power Tesla's Megapack 3 energy storage systems produced in Houston, creating a robust domestic battery supply chain," the U.S. Department of the Interior said in a statement.
Here's everything you need to know about Tesla's new Megablock, the latest in the company's industrial storage product lineup, which includes the new Megapack version 3:
Megablock:
• 23% faster to install with up to 40% lower construction costs
• Plug and play platform (hardware, software and services) delivered as one all from Tesla. It's a pre-engineered medium-voltage block that integrates next-gen Megapack 3
• Eliminated above ground cabling between the transformer and the megapacks using new flexible busbar assembly
• 91% MV round trip efficiency
• 20 MWh of usable AC energy
• Operates in temps of -40°C (-40°F) to 60°C (140°F)
• 248 MWh per acre
• 25-year life & >10,000 cycles
• With Megablock, Tesla is targeting to commission 1GWh in 20 business days, equivalent to bringing power to 400,000 homes in less than month
Megapack 3:
• Will be manufactured in Tesla's upcoming Houston Megafactory starting in late 2026. 50 GWh annual manufacturing capacity when fully ramped.
• 5 MWh of usable AC energy
• Weight: 86,000 lbs
• 28 foot long enclosure that can be shipped globally
• Optimized for up to 8-hour applications
• New drastically simplified thermal bay. Uses Model Y heat pump, but on steroids. 78% fewer connections, which minimizes failure points
• Larger battery module and larger battery cell
• 2.8 liter battery cell, co-engineered with Tesla's cell team
• LFP battery
• Operates in -40°C to 60°
• Went from 24 cable connections in Megapack version 2XL, down to 3 simple busbar connections
• 75% of the mass of Megapack 3 is battery cells.
• A single module in it weighs as much as a Cybertruck
• Tesla has enabled easier front access service, so there are no roof penetrations
• Drastically simplified bussing system
The @USEEOC is hiring civil rights trial attorneys nationwide and @USOPM has made it easier than ever to submit your application and serve your country.
Join the Federal Attorney Talent Network today—go to https://t.co/BOgKHcnqGX to learn more and apply!
Today OPM launched the Attorney Talent Network, connecting attorneys nationwide with federal recruiters and career opportunities in public service. Join the network, make your resume searchable, and get notified about openings and hiring events at the Attorney Talent Network. https://t.co/XIScHyGZuk