For $AEHR this follow-on photonics order matters less as backlog and more as proof FOX-XP is moving beyond the SiC capex cycle.
FOX-XP can burn in up to 18 wafers at wafer level before expensive optical packaging.
800G/1.6T AI data-center links need known-good photonic die. Testing becomes a second-order AI capex bottleneck, not a niche equipment line.
$MU. Blue Candle on a -4.7% red day. Next day: +12%.
Beta model. That is the kind of signal we are building toward. Stable data. Promising results. Best system in the world. We meant it.
300+ charts daily. Try it free:
https://t.co/ZQDP5HCFyq