2022 has been a year to remember. We have been delighted to support our clients throughout this year, and we recently held a series of open days to celebrate Layher’s 20 years of operation in Australia.
https://t.co/wnLhWlbyR7
#Layher#scaffolding#celebration#australia
The problem was how to safely and efficiently achieve a cantilevered, cliff-edge access solution to enable remedial work to be carried out under a pedestrian walkway. Central Scaffolding and Rigging secured the
https://t.co/O3yMImZrcm
#Layher#scaffolding#FlexBeam#pedestrian
Presented by Federation Square in Melbourne, the Art After Dark festival included the Constellations audio-visual installation by the artist Joanie Lemercier. Projecting light through water particles, he created a
https://t.co/o5v2BX05TO
#Layher#scaffolding#events#Melbourne
The Scaffolding Association of Queensland (SAQ) is an organisation that enables stakeholders in Queensland’s scaffolding industry to keep abreast of the best working practices and the latest products in the market. A meeting was held at Layher’s QLD...
https://t.co/4gDySv5iRx
River City Access secured the contract to provide perimeter scaffolding and loading bays for this new-build commercial project. At first glance, the task may appear to be straightforward. However, when taking account of the ever-changing angles in...
https://t.co/7gJvDlaD3K
Pre-assembling scaffolding onto large horizontal steel structures that are later crane-handled into a vertical orientation is not the usual way access is provided in the industrial sector. However, Rize Scaffolding achieved exactly that on a...
https://t.co/Q2RZ62LLvP
It was always going to be tricky to protect the open tanks and general working area of this functioning WA fish research facility from contamination from overhead asbestos removal operations. At short notice, Halson Group...
https://t.co/YRYxP7EJdK
#Layher#scaffolding#FlexBeam
Paragon Scaffolding secured the contract to provide access services to this ambitious waste-to-energy project south of Perth. It is estimated that this remarkable facility will result in the avoidance of approximately 485,000 tonnes of CO₂ emissions...
https://t.co/PD9wuvKrB8
In 1927, the 60 year project to construct St Ignatius Church in Richmond came to a conclusion. This is the first refurbishment work to be conducted on the spire of this fine heritage building, and it was no surprise
https://t.co/xTj490xuoT
#Layher#scaffolding#church#spire
Corrosion remediation work on coal terminal stacker-reclaimers generally involves noisy machinery that frequently has to be operated on a 24-hour timetable to bring reclaimers back on-line as quickly as possible.
https://t.co/nhsXs4JYuZ
Scaffolding to replace the signage at the top of this building was never going to be built from the ground up! Premier Scaffolds secured the project with an imaginative design using their Layher Allround Lightweight (LW) equipment...
https://t.co/i4tldEW9BK
One of the big challenges with this super yacht maintenance project was to provide a scaffolding access solution whilst the vessel remained afloat.
https://t.co/2Ki8RCVeRA
APS successfully secured this project to provide a 13.5m, 5kPa temporary footbridge in support of the major programme presently underway in Melbourne to remove railway level crossings. The APS design comprised the #Layher Heavy Duty Bridge system in...
https://t.co/FwzcFtw7ep
Northland #Scaffolding were contracted to provide access for the removal of ceiling panels at #Auckland#Airport. Located in the airport’s domestic terminal, this #Layher FlexBeam birdcage scaffold measured 36 metres by 18 metres, and stood 6 metres high.
https://t.co/j3VyMdlWzx