🚨 $ACCES is officially LIVE on LBank!
Trading has begun!
Join the movement where AI, blockchain & digital reality meet.
https://t.co/m3UM5kiG2b
#invest#play#own#metacces
Weekly Community Update — June 2, 2026
Prototype (v0) development is progressing through system optimization, focusing on improving cohesion across interconnected mechanics and interaction flows.
Full update:
[https://t.co/pi6oRF8qBk]
Weekly Community Update — May 25, 2026
Prototype (v0) development is approaching a more mature state, with focus on finalizing system reliability and preparing for the next phase of progression.
Full update:
[https://t.co/izfdkj1LaU]
Weekly Community Update — May 18, 2026
Prototype (v0) development is advancing through internal validation, focusing on evaluating system behavior under controlled conditions and refining consistency.
Full update:
[https://t.co/HU7WxvavST]
Weekly Community Update — May 11, 2026
Prototype (v0) development is progressing toward a more stable state, where systems are being aligned and prepared for controlled validation.
Full update:
[https://t.co/nIltgfDkXE]
Weekly Community Update — May 5, 2026
Prototype (v0) development enters a more refined stage — focused on system stability and interaction consistency.
Full update:
[https://t.co/lPri6r6zbu]
Weekly Community Update — April 29, 2026
Prototype (v0) development continues with deeper system refinement and execution progress.
This week’s focus: interaction flow, capture logic, and core system stability.
Full update:
https://t.co/9ZFKg3J9Km
Weekly Community Update — April 22, 2026
Prototype (v0) Vision was released last week.
Execution is progressing as planned.
Full update:
https://t.co/pmcEQDfGCl
Weekly Community Update — April 14, 2026
The Metacces Game execution roadmap is now live.
Progress continues across product development.
Read the full update:
[https://t.co/ZVTxKuyzWc]
Metacces World is not being built as a game — it is being engineered as a living world.
We’ve revealed exactly how it’s being built — step by step.
From first interaction → to a fully evolving world.
Read the roadmap:
https://t.co/8AkHBU7mRn
Weekly Community Update — April 6, 2026
Prototype (v0) structure completed. Product visibility begins.
🔗 Read the full update:
[https://t.co/11n7bGN4xO]
Weekly Community Update - March 30, 2026
The airdrop distribution has been fully completed, and the bridge data review phase is now finalized.
Metacces is officially entering a new stage of execution.
This phase is structured around two coordinated tracks:
• Product Execution — Building the Prototype and delivering the first tangible user experience
• Infrastructure & Bridge — Preparing for the next bridge activation phase within a structured rollout
The full breakdown of this week’s progress and what comes next is now available:
🔗 Read the full update:
[https://t.co/rO4IdMuHGH]
Important:
The airdrop phase is now fully closed.
Bridge Phase 2 will be announced separately through official channels.
🚨 Official Announcement – Airdrop Distribution Completed
The Telegram Bot airdrop distribution has been fully completed for all eligible participants — marking the successful closure of this phase.
📄 Proof of Distribution (Top 10 & Top 100 – Public Reference):
[https://t.co/z0P31SOKJH]
⚠️ This phase is now permanently closed.
No further claims or requests will be accepted.
🚀 Next Phase Begins Now
With this milestone completed, Metacces now enters a new operational stage — the Prototype & MVP phase.
This marks a decisive shift into focused execution, product development, and tangible system delivery.
Metacces Weekly Update — March 23, 2026
The project has entered a critical execution phase, with airdrop finalization underway alongside ongoing progress across the Bridge Transition framework and product development.
Full update:
[https://t.co/Jx1Y8cOKM6]
Weekly Community Update — March 16, 2026
• Airdrop distribution continues 70%+ completed following the wallet verification step.
• Bridge registration form is now officially closed.
• Internal review of submitted submissions is currently underway.
Read the full update:
🔗 [https://t.co/3D4OzLQIgc]
Weekly Community Update — March 9, 2026
Distribution of the Metacces Telegram Bot Airdrop is currently underway in verified batches following the additional wallet verification step introduced to ensure secure reward delivery.
Bridge registration remains open until March 15, 2026.
Full details in the weekly update:
[https://t.co/SlOSG5iNHF]
Weekly Community Update — March 2, 2026
Distribution execution is underway.
Bridge registration remains active.
Read the full update:
[https://t.co/Ycp6g1HIks]
Official Notice — Bridge Registration Deadline Extended
The registration deadline for the Metacces Bridge process has been officially extended to:
March 15, 2026 (00:00 UTC)
All ACCES holders and investors are invited to complete the official Community Alignment Form as part of the structured Bridge Activation process toward the Metacces Chain.
Registration ensures organized coordination and priority handling during the migration phase.
Registration Form:
https://t.co/WAu9y4HT4K
Official Announcement – Phase 5 Completion (Data Lock & Final Allocation Confirmation)
We officially confirm the completion of Phase 5 of the Metacces Telegram Bot Airdrop.
As of today, all datasets related to this phase are permanently locked.
No additional entries, edits, or adjustments will be accepted.
For this stage, up to 20% of the total main airdrop allocation was designated, representing up to 2,500,000 ACCES out of the overall 12,500,000 ACCES allocated to the full Metacces game airdrop program.
The approved distribution structure remains:
• 20% → Top 10
• 30% → Top 100
• 50% → Remaining eligible participants
Based on the finalized stage allocation parameters, the base allocation for eligible participants beyond the Top 10 has been elevated to 10,000 ACCES under the finalized stage allocation.
📄 Top 10 & Top 100 Allocation List – Telegram Bot Airdrop:
https://t.co/ZrlTWOnMjC
Distribution will be executed directly without lock (No Lock) during the current week.
A separate confirmation announcement will follow upon completion of distribution to formally close this stage and transition to the next phase.
Metacces continues forward — structured, aligned, and execution-focused.
Official Notice – Phase 5 Publication Update
The publication of the Phase 5 Final Allocation Announcement, originally scheduled for today, is formally extended for a period of up to 48 hours.
This extension is implemented to complete final internal verification and execution confirmation prior to public release.
All datasets remain closed.
No additional entries are being accepted.
No ranking changes are being made.
The definitive announcement will be released within the stated timeframe.
This notice serves as the official and final update regarding the Phase 5 publication schedule.