BUILDING BRIDGES FOR COMMUNITIES TO CROSS OVER FROM POVERTY TO PROSPERITY
The mega construction of 11 number bridges across the length and breadth of Lere Federal Constituency have commenced and are all to be completed in phases in the coming months, by the special grace of Almighty God. These bridges include:
1. Nasarawa Bridge (Saminaka)
2. Jan Kasa Bridge (Yarkasuwa)
3. Limoro Bridge (Yarkasuwa)
4. Sigau Bridge (Lere)
5. Gamagira Bridge (Lere)
6. Maraban Gure Bridge (Raminkura)
7. Unguwar Tambaya Bridge (Lazuru)
8. Jamaica Bridge (Gure-Kahugu)
9. Kunkuru Bridge ( Abadawa Ward)
10. Wawan Rafi Bridge (Dan Alhaji Ward)
11. Pah Kuduru Bridge (Linking Gure-Kahugu and Yarkasuwa).
Also included in this cycle is the Ayada (Saminaka) concrete line drain works that will prevent flooding in the environs.
Kindly recall that in the months prior, bridge construction works include:
12. Dan Alhaji Center Bridge (Dan Alhaji) completed. Next year, additional work will be included for flood control in the surrounding vicinity.
13. Kadugu-Agaji Bridge (Linking Kayarda to Dan Alhaji). Now, on the next stage, protection works are set to commence.
14. Wuroko Ciki Bridge (Linking Yarkasuwa to Kayarda). Duly completed.
15. Kwaftara Bridge (Sabon Birni). Now, on the next stage, protection works are set to commence.
16. Adana Bridge (Garu Ward). Now, on the next stage, protection works are set to commence.
All the wards in Lere Federal Constituency are beneficiaries in the first phase. Countless lives are feeling the positive impact of these projects as they are now linking up communities that were cut off, most especially during the rainy season. No more loss of dear lives of our women and children that attempt to cross rivers to get to markets, schools, or visit loved ones. Farmers will now be able to evacuate their farm produce conveniently. The socio-economic impact of the entire federal constitution is boosted.
Alas, there is so much more in the pipeline, as more bridges are penciled down for phase two in the 2025 cycle. InshaAllah. With patience and prayers from you all, we are set to continue breaking records.
On this God-given mission that I have to serve the populace, I only have a One Point Agenda, which is my total servitude to building up talakwas to cross the bridge from poverty to prosperity.
Hajiya Balaraba Inuwa, the Hon. Administrator of Zaria Metropolitan Authority @ZariaM_A, visited Hulhulde Rice Mill, a subsidiary of Hulhulde International Limited, to meet with management and prepare for the #ZMAFoodFairAndExhibition on November 25th and 26th, 2023.
@ubasanius
The Hon Administrator conducted an inspection of Kabama Sports Complex, the venue for the Zaria Food Fair and Exhibition along with security personnel from the DSS, Nigerian Police and KADVS in preparation for the event. @GovKaduna@DepGovKaduna@Zazzau_Emirate@BalarabaA_Inuwa
Earlier today the Hon Administrator chaired a meeting with security personnel from the DSS, Nigerian Police and KADVS in preparation for the Zaria Food Fair and Exhibition to hold on the 25&26 of November. @GovKaduna@DepGovKaduna@Zazzau_Emirate@Abdullahi_Lere@BalarabaA_Inuwa
CALL FOR VENDORS!!!
Register now and be part of the very first edition of Zaria Food Fair and Exhibition. Limited stalls available.
#zmafoodfairandexhibition
Update on the Joint site inspection for three road construction sites.
1. Ummaru Dikko to Salihu dan Doka house 74% completion.
2. Kofar Jatau to Gidan Sarkin Magana to Adada Pharmacy 40% completion.
3. PHC to FCE Junction Gyallesu 78% completion. @BalarabaA_Inuwa@elrufai
Construction of Ummaru Dikko to Salihu Dansanda House Road: Excavation of Drainage, Casting of Concrete Base, Placing of Reinforcement Bars and Casting of Concrete Drain in progress