1/3 One of the most important aspects of a golf course that often goes unnoticed by golfers is the irrigation design and layout. As always, Timmy Sethi is on point, keeping us on track while preparing the next BOQ for the upcoming phased irrigation installation.
2/3 The importance of this stage cannot be overstated. Careful planning and design are essential to delivering a modern, future-proof irrigation system that will provide efficiency, reliability, and long-term performance for years to come.
3/3 enabling more precise and efficient adjustment of spray arcs. These upgrades provide a valuable insight into how the future back-to-back design will perform in high-traffic areas, while also improving irrigation flexibility and coverage in the interim.
1/3 Among the heavy showers this week, we experienced a few irrigation-related issues, including a pipe burst and some tank problems. Both were repaired quickly in-house, and the system is now fully operational again.
#Toro#ToroLynx#FutureProof#LevenLinks
2/3 The new phased irrigation system is performing well when required on the holes where the back-to-back sprinkler design has been installed. In the short term, several older green sprinklers have also been upgraded with modern sprinkler technology -
1/2 Like most courses at the minute, our irrigation system is working hard through the night, while the water bowser continues to target areas without irrigation and assist with seed germination.
#LevenLinks
Another settled week with cool, dry conditions has provided excellent opportunities for tournament set-ups across the course.
We also took the chance to carry out some improvement work on a couple of our weaker greens, including mini tining, verticutting and topdressing.
Just a little insight into some of the conditioning improvements over the years.
Thereโs still much ahead of us, but weโre clearly heading in the right direction and making steady progress.
Great work, team @Leven_links
2/2 Work across the course has focused on a range of key tasks, including replenishing turf nurseryโs, applying wetting agents/fertilisers, bowser irrigation & carrying out Terra Raking on rough areas to improve definition & increase density.
1/2 Always a challenging time of year with growth minimal due to dry condition & low temperatures, while expectations remain high from both staff & players.
#LevenLinks
Great progress this week with the new phased irrigation project.
The new 18th mainline is now installed & primed, surge protection in place as well, all ready for the 17th & 18th greens next week.
Attention to detail always at the forefront from Callum & Dougie.