The 2018 Business Plan is available now, with 60-day public comment period thru May 7 – read the draft and find out how to comment https://t.co/4c7wB9sRWf
LAMetro’s Jeanette Owens on Link Union Station: All MetroLink lines but 1 come into Union Station, with 172 trains per day. This will grow to 280 trains once the stubs are run-through tracks. HSR will be up to 2 runthrough platforms and 4 tracks. @USHSR@CaHSRA@CA4HSR