Providing software for CAD & BIM users to get repetitive tasks done quickly & easily. Removing some frustration, helping to meet deadlines & get home on time.
“Just put the spreadsheet on the drawing.”
Then come the formatting fixes. And someone updates Excel.
Watch our Microsoft Office Importer for AutoCAD overview:
https://t.co/EJSBohrbiC
#AutoCAD#OfficeImporter
1200 what? Millimetres? A quantity?
The heading knows. Unfortunately, it’s on the previous sheet.
When tables continue across drawing sheets, repeat the headings and keep units visible.
What gets missed most: headings, units or reading order?
#CADManagement
The spreadsheet took five minutes to update. Getting it back onto the drawing took the morning.
Sound familiar? Watch our Office Importer for MicroStation webinar.
https://t.co/pAgWbDBJ3Z
#MicroStation#CADProductivity
One line on screen doesn’t always mean one element in the count.
An interesting read on hidden duplicate elements in DGNs and what to check before quantity handoff.
https://t.co/Z7S6OnAqbP
#MicroStation#CADManagement
“I only changed one number in Excel.”
But which Revit sheets now need updating?
Importing Excel data is one thing. Keeping it current through revisions is another.
We explore why it matters.
https://t.co/frpXqCLulg
#Revit#BIM#Excel
A DGN file opens in AutoCAD. But did everything translate correctly?
Sometimes, one overlooked setting makes all the difference.
Here's a quick look at Translation Secret #1.
https://t.co/aMwf8sZ1Sw
#MicroStation#AutoCAD#CADManagement
A BIM model can be clash-free and still run into problems on-site.
Why? Because coordination isn't just about space. It's also about time.
Hinkley Point C offers an interesting look at what 4D BIM can reveal.
Read more: https://t.co/DHBsds5yAn
An Excel table looks right on screen. Does it work on the drawing sheet?
Before issue, check:
• Readability at plotted size
• Text, spacing and borders
• How the next revision will be updated
What takes longer: formatting or updates?
#CADManagement#AutoCAD
One standards change. 500 DGN files.
The edit takes seconds. Applying it consistently across every file is the real challenge.
Axiom’s MicroStation tools help automate repetitive batch updates.
How does your team handle project-wide changes?
#MicroStation#CAD
One reference change. Dozens of MicroStation files.
The change takes seconds. Applying it consistently across every file? That's the real work.
Still updating references manually?
#MicroStation#CAD
Which Office-to-CAD task wastes the most time?
A. Excel schedules & tables
B. Word docs & general notes
C. PDF content
D. Updating changed content
Vote below! 👇
#CAD#BIM#MicroStation
A point cloud captures the structure. A dependable digital twin must also reconcile historical records, field conditions and engineering assumptions.
https://t.co/gKlkaCnQu9
#DigitalTwin#BIM
Working in MicroStation often means working across more than one workflow.
Axiom helps reduce repetitive CAD work in MicroStation and supported Bentley applications.
What CAD task takes your team the most time?
#MicroStation#CADManagement
2,400 AI-generated CAD attempts were tested. Only 432 met every applicable engineering and DFM requirement.
A model can look finished and still fail when edited, simulated or assembled.
Can it survive a parameter change?
https://t.co/avqw9m2Ilt
#CAD#AI
Q: Can Excel fractions be brought into MicroStation without rebuilding the table?
Yes. In a recent workflow, the solution was simple: format the Excel cells as Fraction before importing the table.
#MicroStation#CADManagement#Excel#CADProductivity
A CAD project can include every drawing and still be incomplete.
Before handover, check references, linked Office data, support resources, file paths and software versions.
Could another person open, plot and update it without calling your team?
#CADManagement#AEC
Importing an Excel table into MicroStation shouldn’t create another formatting job.
Microsoft Office Importer™ lets you bring in fraction-formatted values, adjust spacing and gridlines, and save preferred settings.
What usually needs the most adjustment?
#MicroStation#CAD
An Excel table can be correct—and still create more work in MicroStation.
Microsoft Office Importer brings Excel and Word data into DGN files as real elements.
Which takes longer: the first import or later updates?
#MicroStation#CAD
A corrupted DGN doesn’t always refuse to open. The first sign may be an element you can’t select, a plotting mismatch or a failed conversion.
See what to look for and how FileFixer™ diagnoses and repairs the file: https://t.co/NpVFzV7BGl
#MicroStation#OpenRoads
The Excel table is already correct. Why rebuild it in AutoCAD?
Microsoft Office Importer™ brings Excel and Word data into your drawing and can keep it linked to the source for easier updates.
Watch the workflow: https://t.co/mAb2vctwnd
#AutoCAD#CADManagement