โจ We were thrilled to participate in the European Researchers' Night! ๐ CEAMS presented innovative metasurfaces for smart cities, giving students and enthusiasts a chance to explore microchips & programmable metasurface chips under the microscope. ๐ฌ
Excited to present our work at ISCAS2024 in Singapore as part of the CEAMS project! An amazing opportunity to connect with top innovators in circuits and systems and share insights.
Reflecting on a year of progress for our @CEAMSPROJECT. Grateful for the dedication of our team. Together, we achieve engineering breakthroughs and pay the way for future success. @SignalGeneriX
Scalable and Programmable metasurfaces can be benefited tremendously with asynchronous integrated circuits. More information can be found in https://t.co/UUHCQWDZip.
Beautiful microphotographs of the WLCSP ASICs for metasurface programmability. Paper info:
"Petrou, L., Kossifos, K.M., Antoniades, M.A. et al. The first family of application-specific integrated circuits for programmable and reconfigurable metasurfaces. Sci Rep 12, 5826 (2022)."
The metasurface unit-cells have a chip on their back for programmability, providing a variety of improvements. RIS's will benefited tremendously from this technology.
https://t.co/0cUz1nMtW6.