I had booked Srillframe side table bearing Order No. LM265749 on 02.10.2026. Delivery was extremely delayed. I called up continuously and finally the customer care girl informed me that it would be delivered on 23.10.2026. As we were traveling for vacations, I requested her to deliver it on 26th. She promised. I did not receive on 26th. I called again on 27th, she with audacity said it will take another 20 days. I requested her to cancel the order. She said ok and also promised refund in a week. I am continously following up till date no refund and not even an intimation. my advice to all my contacts not to truat The Artment. @jagograhakjago@TheArtment@consaff
@Amockx2022 INC lost in Maharashtra, Gujarat , HP and Rajasthan Urban. Having won just one of them you are dancing. Anyhow, it is not normal as admitted by you and will return to normalcy soon.
India is not a member of APEC.
Issue is not which party is in power in India.
APEC was formed in 1989. India applied for membership in 1991.
BJP was not in power then,
India’s membership was rejected on the ground that it had a relatively closed, inward-looking economy compared to APEC's emphasis on open trade and voluntary liberalization.
US as well as Japan were not in favour of India’s membership.
I had argued then that becoming a member would encourage India to undertake economic reforms and liberalise voluntarily to justify its membership.
Russia has been pushing for a trilateral Russia- India- China summit. India has parried this.
If India were APEC member it may not have been possible to exclude India from this summit.
@Jairam_Ramesh Misleading - In 2004 India had a trade surplus of 1.75 billion, which UPA 1 & 2 brought to a trade deficit of 36 billion in 2014. Shame on you guys to peddle this nonsense.
@RahulGandhi No PM was ever invited to APEC meeting, except in 2014 when PM Modi declined. Before that never ever, even during the Rajiv Gandhi & Manmohan Singh as PM they were invited. So, keep your fake gyan. In any case disclose what is in the MOU that you signed.
Fake and misleading.
True account -
-Original Two-Lane Bridge (2000). According to preliminary inputs from the Punjab Public Works Department (PWD), the collapsed steel truss span was originally constructed by the Border Roads Organisation (BRO) in 2000 on land acquired by the state department.
- Bypass Widening and Four-Lane Project (2007–2016). Work to develop and widen the broader Patiala-Sangrur Bypass corridor began around 2007 after the project was assigned to the BRO in 2006. Initial highway reports state the bridge section was completed around 2015–2016, with a parallel bridge built during the four-laning work.
Handover Timeline
• 2018. The National Highways Authority of India (NHAI) officially stated that the four-lane Patiala Bypass section was handed over to them in 2018.
• 2021. Local PWD officials noted that the full stretch along with its maintenance records was transferred to NHAI by 2021
Fake and misleading.
True account -
-Original Two-Lane Bridge (2000). According to preliminary inputs from the Punjab Public Works Department (PWD), the collapsed steel truss span was originally constructed by the Border Roads Organisation (BRO) in 2000 on land acquired by the state department.
- Bypass Widening and Four-Lane Project (2007–2016). Work to develop and widen the broader Patiala-Sangrur Bypass corridor began around 2007 after the project was assigned to the BRO in 2006. Initial highway reports state the bridge section was completed around 2015–2016, with a parallel bridge built during the four-laning work.
Handover Timeline
• 2018. The National Highways Authority of India (NHAI) officially stated that the four-lane Patiala Bypass section was handed over to them in 2018.
• 2021. Local PWD officials noted that the full stretch along with its maintenance records was transferred to NHAI by 2021
@RahulGandhi Is there any result of such mediation by Pakistan? Answer that? The war is continuing and in a bigger scale. Pakistan is being humiliated for its role. You wanted India to face the same and be humiliated, it did not happen and hence you are in pain.
The Punjab and Haryana High Court stayed the ongoing Punjab Civil Services (PCS) and Allied Services recruitment process conducted by the Punjab Public Service Commission (PPSC) due to serious irregularities and fraud committed by the government. Why not go there and do some audit? why not create a Jantar Mantar there?
Fake and misleading.
True account -
-Original Two-Lane Bridge (2000). According to preliminary inputs from the Punjab Public Works Department (PWD), the collapsed steel truss span was originally constructed by the Border Roads Organisation (BRO) in 2000 on land acquired by the state department.
- Bypass Widening and Four-Lane Project (2007–2016). Work to develop and widen the broader Patiala-Sangrur Bypass corridor began around 2007 after the project was assigned to the BRO in 2006. Initial highway reports state the bridge section was completed around 2015–2016, with a parallel bridge built during the four-laning work.
Handover Timeline
• 2018. The National Highways Authority of India (NHAI) officially stated that the four-lane Patiala Bypass section was handed over to them in 2018.
• 2021. Local PWD officials noted that the full stretch along with its maintenance records was transferred to NHAI by 2021
@CJP_for_India Punjab and Haryana High Court stayed the ongoing selection process for the Punjab Civil Services (PCS) and Allied Services examination conducted by the Punjab Public Service Commission (PPSC) due to irregularities. Any comment of audit on this? 😄 🤣
Fake and misleading.
True account -
-Original Two-Lane Bridge (2000). According to preliminary inputs from the Punjab Public Works Department (PWD), the collapsed steel truss span was originally constructed by the Border Roads Organisation (BRO) in 2000 on land acquired by the state department.
- Bypass Widening and Four-Lane Project (2007–2016). Work to develop and widen the broader Patiala-Sangrur Bypass corridor began around 2007 after the project was assigned to the BRO in 2006. Initial highway reports state the bridge section was completed around 2015–2016, with a parallel bridge built during the four-laning work.
Handover Timeline
• 2018. The National Highways Authority of India (NHAI) officially stated that the four-lane Patiala Bypass section was handed over to them in 2018.
• 2021. Local PWD officials noted that the full stretch along with its maintenance records was transferred to NHAI by 2021
Fake and misleading.
True account -
-Original Two-Lane Bridge (2000). According to preliminary inputs from the Punjab Public Works Department (PWD), the collapsed steel truss span was originally constructed by the Border Roads Organisation (BRO) in 2000 on land acquired by the state department.
- Bypass Widening and Four-Lane Project (2007–2016). Work to develop and widen the broader Patiala-Sangrur Bypass corridor began around 2007 after the project was assigned to the BRO in 2006. Initial highway reports state the bridge section was completed around 2015–2016, with a parallel bridge built during the four-laning work.
Handover Timeline
• 2018. The National Highways Authority of India (NHAI) officially stated that the four-lane Patiala Bypass section was handed over to them in 2018.
• 2021. Local PWD officials noted that the full stretch along with its maintenance records was transferred to NHAI by 2021
India has been named ‘Destination of the Year 2027’ by Travel + Leisure magazine
It’s not an occasion for celebration.
At this moment, it’s simply an opportunity.
So let’s not live up to the old joke about “never missing a chance to lose an opportunity”
Time for the Centre and States to double down on seamless visas, hassle-free tourist circuits and world-class visitor experiences.
If the world wants to discover India, let’s make it easy.
I have spent a good part of my life on the question of how this country treats its flag. It took ten years and a judgment of the Supreme Court to win every Indian the right to fly it.
So let me say this plainly. The Tricolour does not belong on the floor. Not as a flag, not as a marker, not in any form. The law is not ambiguous about it, and nor is the instinct of anyone who feels something when they look at it.
What the Prime Minister did in Manila was show utmost respect for his country's flag, something no other leader did for their own. This is what any Indian who respects the flag would have done without pausing to think.
What our PM did is inspiring for all of us.