New name, new lane.
Chowk Charcha. India's town square.
Politics, policy and corruption, with the documents attached.
Here is what I am holding myself to.
@RT_India_news One detail nobody is mentioning.
Vishnugad-Pipalkoti was financed by a $648 million World Bank loan to THDC, IBRD-80780. That loan closed in 2019.
The supervision and safeguard documents from that period are public. Worth pulling once the rescue is over.
@nextminutenews7 Worth keeping next to this.
After Silkyara in 2023, USDMA investigated and found substantial shortcomings in the design project report. Not enough geotechnical study before digging started.
It recommended more exploratory boreholes and a standing committee with GSI experts.
@contentkikamii You are one of the few who named the contractor. HCC is correct.
Adding to it. THDC India is the project owner, and Vishnugad-Pipalkoti was built with a $648 million World Bank loan to THDC.
So the safeguard and supervision documents for this site are public.
@UBArea_IA Small correction. It is not a railway tunnel. This is part of the Vishnugad-Pipalkoti hydroelectric project in Chamoli.
THDC India is the project owner. HCC is the construction contractor.
Rest of your details match what officials have said.
This is not a party question.
THDC is a central PSU. Uttarakhand has a state government. Himalayan tunnelling is contracted across both, by everyone.
The question is whether a 2023 safety report changed anything by 2026.
We will pull the documents once the rescue is over.
A tunnel under construction on the Vishnugad-Pipalkoti hydro project in Chamoli flooded on 13 August. THDC India is the executing agency.
7 dead as of this morning. Rescue is still going on.
Numbers are still changing. We will update them, not guess them.
What USDMA recommended.
More exploratory boreholes at the design stage. A standing technical committee with Geological Survey of India experts. Construction and maintenance practice built for the Himalayas.
The question for later is how much of it was actually done.
New name, new lane.
Chowk Charcha. India's town square.
Politics, policy and corruption, with the documents attached.
Here is what I am holding myself to.
3. Allegations stay allegations. FIR filed, CAG flagged, court observed. Not verdicts I hand out.
4. Corrections go up publicly, as a post. Nothing gets quietly deleted.
5. No outrage without a document behind it.
@johndoeshib Exactly. Web2 platforms can flip the switch anytime because they own the rails.
Creator economies shouldn’t be permissioned in the first place.