@LittleCryptoMe@doge1meme@DOGE_1ToTheMoon Let's do this: let's see if, after the launch of Im-3, your idol doesn't show up—to the surprise of absolutely no one—to back the token, claiming it's easier and blah, blah, blah.
@LittleCryptoMe@doge1meme@DOGE_1ToTheMoon Tell me more about the liquidity he pulled from Xi and the other 20 scam tokens he launched? Seriously, man —you’ve got to be Purchardus and HappyHary
@LittleCryptoMe@doge1meme Explain to me why the
@DOGE_1ToTheMoon
page (wisely, the official token launched by Reid) points to https://t.co/ISPcJJtiTR, which points to this project's token?
@LittleCryptoMe@doge1meme Explain to me why the @DOGE_1ToTheMoon page (wisely, the official token launched by Reid) points to https://t.co/3rL4DJQz5N, which points to this project's token?
@doge1meme You guys are acting in bad faith! You changed the count to a day now that there’s only one launch with a classified payload (government-related), just to fool the suckers again!
@187halfcut@doge1meme I’ve been saying for days that there isn’t going to be a launch! They are clearly acting in bad faith, letting people believe there will be one just to take advantage of the unsuspecting!
@rico_usm@CryptoHeroTradr@doge1meme 4/4
Bottom line: no technical path for DOGE-1 on the 13th.
It still needs a proper lunar window (likely later in H2 2026 with an IM-class mission).
@rico_usm@CryptoHeroTradr@doge1meme 1/4
Technically unfeasible for DOGE-1 on the Sept 13 flight.
That Falcon 9 is flying O3b mPOWER to Medium Earth Orbit (circular ~8,000 km).
DOGE-1 is a lunar rideshare that requires Trans-Lunar Injection (TLI).
@rico_usm@CryptoHeroTradr@doge1meme 3/4 Even if you ignore the trajectory, the practical barriers are huge:
– Payload integration & CG already locked
– Fairing configuration set for SES satellites
– Mass margins calculated
– FCC spectrum + range safety licenses are mission-specific
Last-minute swap is not realistic
@rico_usm@CryptoHeroTradr@doge1meme 2/4
MEO vs TLI is night and day in orbital mechanics:
• MEO: low Δv, circularization burns
• TLI: high-energy second-stage burn (C3 ≈ -2 to 0 km²/s²) to reach the Moon
Different trajectory, different burn profile, different deployment sequence.
@rico_usm@CryptoHeroTradr@doge1meme Technical possibility ≠ evidence. Sept. 13 is manifested for O3b mPOWER 11/12/13 to MEO, while DOGE-1 is manifested on IM-3 for TLI. A lunar rideshare requires compatible trajectory, integration and regulatory work. No evidence currently shows DOGE-1 on the Sept. 13 flight.
@doge1meme The worst part is that one of the people involved in the project claims to be a Christian, yet is actually a servant of Satan—only a follower of darkness would act to keep others deceived!
@rico_usm@CryptoHeroTradr@doge1meme Doge-1 is a lunar mission; the one you're referring to is a medium Earth orbit mission! Doge-1 won't be on that one!
@doge1meme They should have announced the launch being moved up by now; a lot of people are losing—or are going to lose—money over an event that won't be happening this weekend!