@CityTshwane@GTP_Traffstats@GautengProvince Can we please arrange for city of Tshwane to put in temporary 3way stop signs at the intersection of R55 and M26, Erasmia this section of the road will become a death trap to motorists. Traffic lights were cut down overnight.
Please switch off all non-essential electrical appliances during #loadshedding to avoid power surges when the power returns. Failure to do so may lead to unnecessary trips or damages to household appliances when the supply is restored.
Stage 2 loadshedding will be implemented this evening 11 May 2022 from 17:00 – 22:00 tonight due to the failure of three generation units
Based on the rotational loadshedding schedule Laudium, Erasmia and Claudius will be affected from 17:00 until 18:30
Laudium reservoir has recovered and water level will continue to build up over time.We are monitoring the recovery of the Atteridgeville reservoir.
Residents are urged to use water sparingly to enable the affected reservoirs to recover to maximum capacity. #WaterUpdate
Breaking: #Eskom to implement Stage 2 load shedding from 4pm until 9pm tonight. 22 July 2021
Laudium, Erasmia and Claudius will NOT be affected.
Eldoraigne, Raslouw and Sunderland Ridge will be affected from 4pm to 6:30pm
@CityTshwane@tshwane_mayor Laudium residents are without water for the past two days. This is a common occurrence in the suburb, and to top it of off Erasmia residents don’t have electricity from early this morning .