Dear Citizen,
The TP officials inspected site and instructed builder to furnish the copies of construction/blasting/rock cutting permission for verification and also instructed not to take up any such activity till verification completes. @VijayGopal_@CommissionrGHMC@GHMCOnline
Madam
Dilapidated buildings inspected at Vambay Colony Mangar Basthi, Mallepally by GHMC, RDO, Tahsildar, and Police. Caution notice affixed. Requested them to vacate at earliest and take shelter at temporary accommodation.@CommissionrGHMC@GHMCOnline
Madam
Inspection of Dilapidated Structure at Chaitanya Nagar, Patancheruvu Circle by GHMC TP Officials. Vacated and issued notice for demolition of the structure. @CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of cellar excavated sites by GHMC TP Officials at Somajiguda and Road No.12, Banjara Hills. Stopped the work due to monsoon and instructed to take up precautionary measures. @TelanganaCMO@TelanganaCS@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of site by GHMC TP Officials at Pet Bashirabad. Site covered with compound wall and sheet and no labour camps found inside the site along edge of walls. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of site by Sri.Devender Reddy, DTCP along with GHMC TP Official at Chinthalkunta. Cellar work retaining wall completed. Instructed to stop work during the rain and stay away from the site. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection by GHMC TP Officials of cellar excavated site at Road No. 12, Banjara Hills. No work at site. Instructions issued to remove labour camp and relocate to safer side. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of site by GHMC TP Officials at Raidurg Navkhalsa. Excavation completed and part of retaining wall is under construction. Instructed to vacate the room immediately and take safety precautions. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspected of site by GHMC TP Officials at Somajiguda. Instructions issued to the builder for removing labour camp. Precautionary measures advised. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of site at Raidurgam. Retaining walls completed and another side excavation is completed. No labour camp at site. Precautionary measures advised. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of site by GHMC TP Officials at Pillar No.130, Attapur. (6) families are staying within the site. Instructed the concerned person to take all precautionary measures and do barricading of site. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of site by GHMC TP officials at Attapur, Rajendranagar. Labour camp is located 1km away from the site. Precautionary measures advised. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC@GHMCOnline
Sir/Madam
Inspection of site at Upperpally. Labour camps are away from the excavated area. Two families are staying in the basement, informed the builder to vacate them and accommodate in the labour camp. All precautions ensured. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC
Sir/Madam, Inspection of excavated cellar construction site at Kukatpally. Advising concerned person to take all precautions. @TelanganaCMO@PrlsecyMAUD@CommissionrGHMC