🚨🔵 𝐍𝐄𝐖: Zagreb Mayor Tomislav Tomašević expects the new Maksimir Stadium to open by the end of 2030.
Construction could begin in early 2029, with the current estimate putting the construction period at around 22 months.
The stadium is estimated to cost €175m excluding VAT, rising to just over €200m including the garage complex.
My head gasket is gone. Destroyed. I had no injury / injuries going into the fight. I was throwing kicks, planted and jumping, all throughout camp as well as backstage before the fight. This came out of nowhere. I am beyond dark here. I can only describe it as hell.
🚨Win a @MercedesAMGF1 P1 shirt, signed by Kimi Antonelli🚨
To celebrate Kimi’s race wins so far, we’re giving away a signed P1 shirt 🏁
To enter:
• Follow @PET_Motorsports
• Like and repost this post
• Tag two friends in the comments
Entries close Sunday, May 24 at 23:59 (MYT). T&C’s in our bio.