Full service of a 950 kw Kob Viessmann boiler for a customer in the midlands.
This boiler was installed by us in 2014and is a very hard working boiler but is wearing well.
So the saga continues with the heat exchanger tubes being tarred up and the rezi gas valve being unusable and the pipework being completely blocked. A local engineering company are producing a new valve for us tomorrow and the rezi gas pipework is now clear.
This weeks work for two of our engineers, Conor & Keith, bringing a 1Mw Urbas boiler back on stream in Belfast, after a combustion chamber rebuild.
The 12 year old boiler has been inadequately maintained, the photos show the condition of the O2 sensor and the Resi-gas fan.
@VixsterG@northumbriapol @OCHQCoyNACF Lord Stephens an absolutely inspirational man, whom transformed Northumbria Police and took the fear of crime back to the criminals , we need a leader like him now.
The first adult study weekend for 3 years and we wouldn’t want to miss an opportunity to celebrate success, thanks to Lord Stephen’s presenting cadet force medals and a Royal Humane society commendation
Not so very long ago this 100Kw leaking Viessmann log boiler would have been condemned as beyond economical repair and a new one ordered. Not now removed from site to be repaired.
#bbs#wefixbiomass#service#maintenance
BBS we just fix biomass boilers
Happy New Year to all of our customers and friends, during the festive break ,two engineers have breathed new life into this KWB woodchip boiler for a sawmill in Scotland.
The control panel was replaced and the boiler is now running .
If we can help call 01289 305455
Two of our engineers Andy & Andrew have just finished re-lining two boilers in Yorkshire,they are part of a district heating scheme, another happy customer. Well done to all involved
If we can help you with your biomass or wood waste boilers phone 01289 305455
Just received a link to the course photo from our Senior Officer and Area Commanders Course in September @nacfpro arrived on mass and had a fantastic week in our spiritual home #RenovateAnimos#SpotTheHackle#FamousFive @The_RE_LE @depcomnacf @OCHQCoyNACF @FusiliersRHQ
An upper chamber rebuild coming along nicely, after clearing all of the rubble from a badly damaged arch , the first arch of 15 has been built. Good work from a team of three engineers.
If we can be of help with your boiler call 01289 305455.
This weeks mammoth task start rebuild of triple pass combustion chamber. Four pallets of arch bricks two pallets castable and one pallet refractory cement. One skip of refractory removed last week.
And so onto the next job for our intrepid engineers, subcontracting to another company, ‘No Names No Pack Drill” for some minor repairs to the combustion chamber brickwork!
On further internal and external examination there were signs of considerable damage to the boiler.
Absolutely first class job guys, well done to Andrew, Andy and Ian, less than two weeks from a total strip out to rebuilt and ready to fire up.
To see if we can meet your biomass needs please call the office on 01289 305455 .
The second full week of a full rebuild of a Viessman boiler being carried out by two of our experienced engineers, one of whom is the MD Ian Chappell.
We’re on course for the job to be completed by this weekend when the boiler will be hand fired to around 350 degrees.
What a week! A pleasure hosting the Master Cadets. A great deal of courage shown by all who took part over a week of activities. Proving that they had the qualities required to pass the Master Cadet course. @CTCFrimleyPark@ArmyCadetsUK@CCFcadets