Bunker reconstructions are nearing completion, with just four more to finish.
This week all of our machinery underwent full HAVS and noise assessments to ensure the workplace remains compliant.
Greens looking and rolling well as we head into the start of the season.
#LevenLinks
Upgrades continue, including an additional irrigated grass pathway at the second and ongoing bunker reconstruction.
#ToroMini8#BunkerRevetting#LevenLinks
The busy schedule continues, with today dedicated to enhancing challenging greens via the DryJect sand injection method.
Thanks again to Ken and Jacob.
#LevenLinks
2/2 The current coloured flag locations will remain in use for now; however, these will be phased out ahead of the start of the season, returning to the traditional two-colour system distinguishing the front nine and back nine.Simply scan the QR code and try it out.
#LevenLinks
1/2 Leven Links has partnered with Clere Golf to provide pin locations around the course via a mobile app. For those without access to a smart device, a paper pin chart will be available prior to play.
Productive last few weeks with the second hole double fairway now linked together.
Changes to the 14th green include a more in-play and aesthetically improved bunker.
Greens are rolling well after some small pencil tinning.
Happy Christmas from all of the Leven Links Team.
2/2 As always, many thanks must go to Callum & Dougie at Applied Irrigation for their attention to detail, first class as expected.
Next up, more bunker construction and shaping work.
#LevenLinks
1/2 The phased irrigation install is now complete.
The new design and spec of pipework is showing its worth, with the impressive coverage over one of our largest greens here on the Links.
We are delighted to continue our partnership with The Double A Trading Company with our updated fleet of John Deere machines.
The service from the entire team has been outstanding, and we look forward to working closely in the future.
Many thanks.
#LevenLinks
@Frampton1992 Yes Joe, we have also included surge copper plates that are attached to the copper pole away from the valve box via an earthing cable. Toro spec and recommendation. π
Great progress this week with the new phased irrigation project.
The new 18th mainline is now installed & primed, surge protection in place as well, all ready for the 17th & 18th greens next week.
Attention to detail always at the forefront from Callum & Dougie.
#LevenLinks
2/2
Cat & Genny work involving pipe & cable tracing
Next week, our main fescue overseeding will take place on greens and intermediate aprons.
#LevenLinks
1/2
End-of-season maintenance that has been ongoing over the past few weeks.
Dyan mini coring greens
Disc seeding pinch points and tees
Terra raking roughs
Selective fairway fertilising
#LevenLinks
Great weather for hosting the Scottish Seniors Amateur this week.
Fairways are bouncing back after a dry summer, with more fescue being seeded into specific fairways to aid further recovery.
Irrigation materials starting to arrive for our phased irrigation install.
#LevenLinks
1/2 Last night, we made a great start with greens aeration. The 9mm tine allow the greens to breathe with minimal disturbance to the surface. This procedure will be completed in the next couple of days.
#LevenLinks
1/2 - This August (YTD) has been the driest in five years, presenting challenges but also opportunities to improve our surfaces during peak times.
Whilst greens are performing well, there are some minor imperfections from disease issues here & there.