@amitisinvesting@aaronburnett Critical path to 10 GW by EOY 2027:
Need 1.5–2 new 500 MW sites energized every month through 2027.
Turbines are the real bottleneck — locking in & installing ~8+ GW of gas generation capacity is what actually gates the entire ramp.Power first. Everything else follows. @SPCX100T