Just published the first article in my series on how to build a trillion dollar economy. This piece focuses on nation building, an extremely important but unglamourous part of building a prosperous nation. Please read, share, comment and subscribe!
https://t.co/rJoNFc7YY1
This type of power build out will be expensive af at the consumer level. We need a built out grid for scale and redundancy.
Countries bigger and more complex than Nigeria have built a national grid successfully, no reason why we can't. We aren't special, just lazy.
1/
Welcome. Thank you for reading. You asked the right 3 questions. I will answer in simple layman language, no big grammar.
I am Idowu Oyebanjo - BSc Power Engineering, UNILAG. MSc, PhD Power Systems, Manchester. Former CTO, PPI (Siemens).
NUPRC 2026 Licensing Round Portal Goes Live
The Nigerian Upstream Petroleum Regulatory Commission wishes to inform the general public that the 2026 licensing round portal is now live.
Registration on the portal – https://t.co/S9GvxBaPtZ – began on November 20, 2026 and will close on January 15, 2027.
On offer are 40 oil and gas blocks across three terrains. The blocks are grouped as follows: Onshore (17), shallow water (14) and deep offshore (9).
Interested bidders are urged to visit the site to view the full list of the 40 blocks as well as the guidelines and frequently asked questions.
The website is programmed to offer a seamless experience for users.
The round will run through five stages: Registration and prequalification, access to data, submission of technical and commercial bid, technical evaluation and commercial conference.
The licensing round was first announced by the Commission Chief Executive on October 6, 2026 following the approval of His Excellency, President Bola Ahmed Tinubu, GCFR and Honourable Minister of Petroleum Resources.
The announcement of the round was accompanied by statutory newspaper advertisements locally and internationally in line with the Petroleum Industry Act.
With the bid portal now open, the next event is the pre-bid conference which takes place in Lagos on December 16, 2026.
The Commission will provide further updates on the licensing round through the bid portal and its official social media handles.
Eniola Akinkuotu
Head, Corporate Communications and Media
buhari btw, what a guy, his policies were so bad that socialists/communists don’t claim him, capitalists don’t claim him, even economic intellectuals hate him, they gave him his own category called “buhariconomics”.
70 points could genuinely be enough to win the league this season yet Arsenal fans will still try and tell you it's harder than it's ever been to win the title 😭😭
What about coal? I don't mind dirty power. Let's industrialize first, we can worry about climate change later.
I'll take some smog for $10K GDP per capita
We do not currently have the active gas processing, pipeline delivery, or commercial liquidity required to support an additional 10,000 MW of power generation, and delivering it within four years is simply not realistic.
Generating an extra 10,000 MW from gas-fired thermal plants requires roughly 2.0 to 2.5 billion standard cubic feet per day (bscf/d) of additional dedicated gas supply. That would mean nearly doubling Nigeria’s entire current domestic gas supply in 48 months.
First, there is a severe liquidity crisis in the sector. Upstream gas producers have zero appetite for major new domestic investments unless the market fully transitions to a willing-buyer, willing-seller framework and regulated domestic price caps are either removed or adjusted to reflect market realities.
As for Non-Associated Gas (NAG), nobody is committing the billions required to develop deep standalone gas fields under the current commercial regime. Meanwhile, existing production is heavily tied up in NLNG export commitments, and while trunklines like AKK and OB3 are nearing completion, hundreds of kilometers of critical last-mile spur pipelines and processing facilities still need to be built.
On the generation side, our headline "installed capacity" is misleading. Roughly 3,000 MW of our existing fleet is functionally obsolete, and another 2,000 MW sits idle due to deferred maintenance. Owed trillions of naira in legacy market debt, GenCos lack both the financial muscle and the commercial incentive to procure FX for OEM spare parts or replace worn-out turbines.
Beyond generation, the midstream and downstream bottlenecks are just as steep. We still need massive capital for high-voltage transmission expansion to safely wheel an extra 10,000 MW, alongside fixing the deep technical, collection, and infrastructure gaps across the DisCos, all while the industry remains weighed down by trillions of naira in debt.
Give or take, unlocking 10,000 MW all the way to Nigerian homes requires $35 billion to $50 billion in end-to-end capital expenditure. You cannot attract that scale of private capital into a market where tariff subsidies and payment defaults are still the order of the day.
I agree, and even I have had to ask myself why I’m so comfortable with the lack of state capacity for anything.
We need to be calling out our leaders on this cos this lack of capacity is paid for by the citizens and it makes no sense.
This guy jazzman strong walahi! That’s the only way to explain this hold he has on people.
This is why I always say that it’s those that haven’t seen Anambra state well that he can whine.😭😂
There's no concept of Hutus and Tutsis in Rwanda right now. They've homogenised their culture and society into a singular ethno-national Nyarwanda identity
"The people who campaigned with electricity for 12 years with no difference, what is their duty?"
Their duty is to lie to Nigerians so they can get another term.
You have to understand, it's really not that hard. They know Nigerians don't read and don't study and think that in a literal democracy, governance can be left entirely to governments.
So the government comes out and literally lies about what's possible. Have they not been promising 24/7 power for the past 50 years? Did we get it? Of course not.
They realized telling Nigerians the truth will get them stoned, but you can just lie and keep winning, so they did just that.
That's why when Atiku thought Nigerians were finally ready for the truth, he supported fuel subsidy removal, but when he started seeing that Nigerians couldn't handle it, he decided to break the elite consensus on the topic to gain popularity amongst the electorate.
You think Atiku doesn't know Nigeria can't afford a meaningful fuel subsidy anymore? Of course he does, he just cares more about his personal ambition, so he'll say anything he thinks we want to hear and when he gets in office he'll apologise for 4 years and lie again at the next campaign trail.
Likely he copied the tactic directly from the ACN, who used their opposition against the subsidy removal in 2012 during Jonathan's tenure to gain political mindshare and it worked like a charm. But imagine how much better your life would be now if enough people had told them to shut the fuck up and get lost and we'd removed the subsidy a decade earlier?
We are suffering from the backlog of consequences from years of mutual delusion between the officials and the electorate. That the officials are willing to continue playing the game is not surprising, their gains from it are massive.
But why are we willing to continue?
BREAKING: The US Securities and Exchange Commission (SEC) is launching an investigation into "potential accounting issues" at Nvidia.
Nvidia stock, $NVDA, extends losses to over -8% on the day and -45% since October 6th.