Our client required grills manufactured in a custom colour to fit with the high quality finish. They also requested the slip resistance to be designed and tested to achieve the required slip resistance. Poly Advisory can manufacture to any Ral colour or grill design.
A recent overflow channel lining project completed in Gateshead along with new HDPE grills. The existing lining had failed and the channels were in poor condition.
Making good progress on our refurbishment of the pool tanks, pools surrounds and changing rooms at Antrim Forum leisure centre. Some big kit in to prep the floors.
Machine busy cutting a large drainage grill order ready for install for Oxford City council while the other machine is cutting manhole lids. Flat out production in the factory ready for the site team.
Nice to have completed our works at Alton Towers water park laying our PASBEAD flooring to large areas along with a re-coat to the PASLAM lining in little leak.
A nice school pool refurbishment completed, PASLAM lining to the troublesome pool tank and PASBEAD non slip flooring to the pool surrounds. This pool had a unique set of problems we had to address for the client to achieve this excellent finish.
This week saw the handover of Sandwell Aquatics Centre to @sandwellcouncil. Phase 1 is now complete and further work will be carried out later this year.
The venue will provide a range of facilities to the community and will act as a major catalyst for regeneration in the area.
Pallet of custom sized extra large HDPE access covers being dispatched from our factory, all manufactured to clients individual sizes to replace existing corroded access covers.
Pleased to have been part of the new Chard leisure centre project, pool surround drainage channels supplied and installed by Poly Advisory with the grills in a one off Anthracite grey to match the tiles.
HDPE plastic boom installed to divide a 33m pool into 25m main and separate learner pool. Client wanted a 2m wide walkway on this installation with grey walkway.
Amazing transformation on this school pool in Cornwall. When we removed the PVC bag liner it revealed all sorts of problems. All dealt with and a very happy customer with a great finished project with no extra costs!
Delivery of 12 composite access covers and frames going out to the new Camberley leisure centre construction site. These can be manufactured to suit any size with the recessed lid to accept tiles.
Stainless steel barrier rail supplied and installed by Poly Advisory to complete a refurbishment project, holes diamond drilled and stainless post set in.
Slightly different project here, this baptismal pool has been leaking for years, PASLAM epoxy lining membrane installed with coloured detail to suit the clients requirements, anti-slip finish on the steps and floor.
Nice refurbishment on this steel pool in Wales lined by Poly Advisory over 20years ago, full recoating on the pool tank and new PASBEAD non-slip flooring to the pool surrounds. Client is very happy with the refurbishment, just need lockdown to finish so they can open!
Poly Advisory transformed this swimming pool with a refurbishment that included wall cladding with full colour print in vibrant colours creating a much brighter swimming environment. All designed, printed and installed in house by Poly Advisory.