We're back, and no longer down with the sickness.
This week at Williams Street, we’ve cut in the floor boxes and now onto the plastering. For the external angles, we're going with a Bullnose finish instead of square for the walls. Looking forward to seeing how it turns out!
Back at Kew, and we're getting some progress with screeding the floor and some of the featuring tiling in the bathrooms.
Just a short post this week cause the flu has hit, but we'll be back next week faster, stronger and more QTCier than ever before.
We’ve spent the past week in Kyneton demolishing an old Vet to make way for a new Dental Clinic.
The skip was two days late, so we had to pull everything apart and sort it out while we waited.
Now, it’s time to do our backs in while we pull out thousands of staples and nails
We’re starting a new project this week in the CBD on William Street!
Demolition is kicking off, and we're already getting partitions up with a race to get this handed over by Christmas - but I’m confident we’ll make it happen.
Stay tuned for updates as we progress!
Kew Update: It’s a rainy day outside, so we’re staying busy indoors! The undercoat is on, and we’re currently spraying the ceilings.
This sure beats all the plaster dust! But this weekend, it’s all about the floor grinding so we'll be reintroducing some mess to the project
Kew Update: We've hung all the plaster, and now we're stopping up and sanding.
If you're sensitive to dust, I wouldn't recommend being on site.
Even with masks on, I can feel plaster in every pore of my body.
Looking forward to starting painting next week! Happy Friday!
Cause I'm a bit of a control freak, I like to make sure everything’s perfect so I’ve been marking out on the floor and projecting up to the ceiling to get the cutouts just right.
And I only had to wash my eyes out once with Saline cause of Plaster Dust.
In preparation for the installation of the Dental Examination Lights, we've chucked up some Structural Plywood at the centre of the Fittings Fixing point. This is to prevent any risk of the equipment falling, and also to reduce any and all movement that could cause cracking
QTC has turned 3 YO! It's been such an amazing journey over these passed few years, filled with amazing projects and awesome clients. We're lucky to work with such a great group of trades who have been pivatol in our success. Here's to another 38 years
Boring whole day? More like Boring Hole Day! Which was quite exciting actually.
Today we bored out a variety of different-sized holes for dental services, including lines for suction, compressed air, water, waste, electrical, switching, body protection, and provisional conduits
When installing X-Ray machines in dental clinics, strong bracing is essential due to the frequent use & extended reach of the arm, which puts significant stress on the mounting plate.
For more inquiries
☎️ 1300 728 723
🔗 https://t.co/pKU92i8mnb
Quality Assured, Cost Effective
🔧 This week at Kew, we're getting ready for some concrete coring for the Dental Chairs.
Stay tuned for updates! 🚧🔨 #Construction#ConcreteCoring#SafetyFirst
Reach out to us at:
☎️1300 728 723
🔗https://t.co/pKU92i8mnb
Quality Assured, Time Sensitive, Cost Effective
We've recently installed a Mesh Security Gate for a client with access control and a mag lock.
The gate fits in well with the exposed ceiling, concrete foyer, & brickface walls in this office design.
☎️: 1300 728 723
🔗: https://t.co/pKU92i7OxD
#QTCBuild#OfficeDesign#Fitout
We're making steady progress with hydraulic and electrical rough-ins underway. We're also installing Blue Board, Fyrchek, and X-Block Plaster.
Pretty riveting stuff right?
Reach out to us:
☎️1300 728 723
🔗https://t.co/pKU92i7OxD
#QTCBuild#OfficeDesign#Fitout
Today's tip: Get your sparkies to pretend to look at the plans with you. Now it looks like I'm working hard and that's the social media post done for the week!
Reach out to us:
☎️1300 728 723
🔗https://t.co/pKU92i7OxD
#QTCBuild#OfficeDesign#Fitout#ProjectManagement
As a new small business, the majority of our work has been through word of mouth, for which we are extremely grateful.
Now, we are thrilled to announce that we have been working on improving our SEO, Social Media and Google advertising, and we're ready to expand our team.
Kew Update: We've established site and installed a whole lot of new insulated flexi duct.
The main bars and furring channels are going up, and the floor plates are going down.
☎️: 1300 728 723
🌐: https://t.co/3kGr8QptHB
There's no project updates this week, just a photo of an overworked builder relaxing poolside with a Bloody Mary in the 23-degree Queensland weather.
Looking forward to returning to Melbourne and diving into our next big project.
Cheers!
Now, you might think you're looking at an empty Cold Shell of an office building, and you'd be right. But soon, this space will be transformed into a 6-chair dental clinic with a 450 square meter floorplate in the heart of Kew.
☎️: 1300 728 723
🌐: https://t.co/3kGr8QptHB
Welcome to Creative Smiles in Armadale! We recently completed an amazing fitout of their reception area, featuring new flooring, joinery, and painting throughout.
☎️: 1300 728 723
🌐: https://t.co/3kGr8QptHB
Quality Assured, Time Sensitive, Cost Effective