The Prophet Muhammad Peace Be Upon Him Said
"Purity is Half of Iman"
Meaning The Both Purity of Body And Soul.
The Purity of Body is such as, Cleaning your Private parts With Water after Urination or Excrement, And Taking Ritual Bath of Janabah After Mating With your spouse.
For Soul, Meaning having a good heart, No grudge or envy and hatred of others.
Allah Is The Best.
Found Another Early Airdrop Oppertunity πͺ
β Free β’ Easy to farm β’ No refer play
β Time: 10 mins
β Reward: Points β’ Future incentives
@PickleChain is a real-time Ethereum L2 with 10ms mini-blocks.
How to farm ππ»
1. Claim Faucet
β https://t.co/QivR7aMdpt
β Get 1 test ETH + 50,000 test PKL (every 24h)
2. Play Games
β https://t.co/jBnuQ9QzYK
β 6 on-chain games (Snake, Crash, Claw etc.)
3. Use DEX (Pepper)
β https://t.co/ikWOKTBRca
β Swap + Provide liquidity + Stake PKL + Launch token
4. Register Name
β https://t.co/u4q5oPHaAW
β Get yourname.pkl
5. Earn Points
β https://t.co/ZSoe5dyRxf
β Points for trying testnet features
6. Toolkit
β https://t.co/4FU2k3g95m
β Mint NFT, Multisig, Lock, Vesting, Stream etc.
7. Pickle Account
β https://t.co/MPUX3Gb34M
β One sign-in for all Pickle apps
8. Mini-block Feed
β https://t.co/PZrZVVmdlE
β Watch live 10ms preconfirmations
π Super early alpha with points system start farming rn before everyone else post about it.
No official airdrop announced yet.
β€οΈ Like
π RT
π Bookmark
Follow @9Xvenom for more.
NFA. DYOR.
The most funniest And Unsophisticated People I've ever seen in my life are Atheists :π Look at the Heaven, Sun, Moon, Oceans, Rainy weather and Dry season But No one Controls all these? And Nobody Created You?.
The most funniest And Unsophisticated People I've ever seen in my life are Atheists :π Look at the Heaven, Sun, Moon, Oceans, Rainy weather and Dry season But No one Controls all these? And Nobody Created You?.
πͺ Orbinum Season 1 Testnet Is STILL LIVE
β Airdrop Pool: 50M $ORB
β Season 1: 20M $ORB
β TGE: Full unlock
β Vesting: None
@orbinumnetwork is running its Season 1 testnet with a 5% community airdrop pool.
How to farm ππ»
1. Register
β Open https://t.co/YJxOGvIf7G
β Connect your social accounts
β Claim the testnet faucet
2. Daily Check-In
β Come back daily
β Claim your ORB
β Stay consistent
3. Complete Weekly Tasks
β Block
β Private Transfer
β Unblock
β Selective Disclosure
π Important notes:
β Season 1 has 20M $ORB allocated
β Full TGE unlock with no vesting
β Testnet is still live
β Consistency matters more than doing everything in one day
β€οΈ Like
π RT
π Bookmark
Follow @9Xvenom for more.
NFA. DYOR.