Every great journey starts with a strong partnership.
For the last 8 years, our partnership with @EnaCoach has been focused on one goal: delivering high-performing buses that provide passengers with safe, comfortable, reliable, and exemplary travel experiences.
We're proud to be part of ENA's journey and grateful for the trust they continue to place in us and our buses.
Here's to many more years of success together!
Every minute off the road impacts your business.
That's why Scania Assistance is available 24/7, connecting you to experts who know your vehicle and are ready to help when the unexpected happens.
Read how one call can help keep your business moving. https://t.co/N9ArOJ2Opi
Every mining operation depends on moving materials efficiently.
From the moment it leaves the excavation site, reliable transport plays a vital role in keeping production on schedule. Our mining transport solutions are engineered to perform in demanding environments, helping operators move heavy loads with confidence, durability and consistent performance throughout the working day.
Learn more about our transport solutions for mining operations: https://t.co/s1EdQc8ZIh
Scania Rental is now available in Kenya!
You can now access reliable trucks with flexible rental periods, maintenance, repairs and support included, helping you keep moving when your operation needs extra capacity.
Learn more and request for a consultation with us:
https://t.co/5Xmg4AwBj4
Experience is valuable, but continuous learning keeps performance moving forward.
Every journey presents opportunities to improve fuel efficiency, enhance safety and reduce unnecessary wear through better driving techniques.
Our Driver Training programme helps drivers build habits that support long-term operational performance for both the driver and the business.
Invest in better driving by enrolling today: https://t.co/FakYJVa8nQ
The roadside assistance you rely on is still here, now enhanced through Scania Assistance.
Instead of contacting individual workshop numbers, every roadside assistance request is now logged, tracked and coordinated through our dedicated call centre, giving you one clear point of contact from start to finish.
Please save and use the new numbers for all future roadside assistance requests.
Kenya (Free to Call): 0800 723 384
Tanzania (Free to Call): 0800 783 384
Other Regions: +27 12 946 0031
Your business depends on vehicles that are ready to perform every day.
Our workshop is designed around one priority: keeping your fleet moving.
From reception to final quality checks, every step is focused on delivering reliable service and helping maximise vehicle uptime.
Watch the full video to see our process in action. When your vehicle is due for service, bring it to our workshop or get in touch with our team to discuss your maintenance needs. https://t.co/jrj5fr90uE
A safe and efficient journey begins before the engine starts.
Taking the time to inspect a vehicle correctly can help identify potential issues early, reduce unexpected downtime and keep operations running as planned.
Our Driver Training programme equips drivers with the knowledge and discipline to carry out thorough vehicle checks and operate with confidence every day.
Enrol today: https://t.co/eVkpJHxoFL
Need more control when demand changes?
Scania Rental helps you plan with predictable monthly costs while giving you access to a reliable truck, with repairs, maintenance, tracking and tyres included.
Learn more and request for a consultation with us:
https://t.co/PExHXj99YG
Keeping your vehicles on the road takes more than routine maintenance. It takes the right expertise and the right support.
Our Nairobi and Mombasa branches offer accident repairs, repair and maintenance, parts sales, Scania Assistance and driver training, while our Eldoret and Nakuru branches provide repair and maintenance, parts sales and Scania Assistance to help keep your operation moving.
Use the link below to find your nearest branch and plan your next service or repair:
https://t.co/hhYQPuaY3N
In transport, performance is not just about power. It is about how well a truck fits the job it is doing, day after day.
The G460 shows what that looks like in practice. Watch the video and take a closer look at the applications our trucks are built for. https://t.co/opgQm8hVfS
Good driving is developed through practice, guidance and consistent feedback.
When drivers understand not just what to do, but why it matters, they make better decisions that improve safety, reduce fuel consumption and help protect the vehicle over the long term.
Whether you are looking to strengthen your own skills or improve the performance of your fleet, our Driver Training programme provides practical knowledge that delivers lasting results.
Enrol today: https://t.co/eVkpJHxWvj
Every driver decision shapes the outcome of your business, from fuel consumption to vehicle wear and overall uptime.
This article breaks down how structured driver training turns everyday driving into a measurable advantage. With the right skills and consistency, drivers can reduce operating costs, improve safety and deliver more predictable performance across every trip.
It is not about driving more. It is about driving better, with control and purpose. Do not leave your results to chance. Enrol your drivers and start improving performance where it matters most: https://t.co/hKyESf51sj
As a bus operator, efficiency and an excellent passenger experience go hand in hand. Our buses deliver on both, enabling you to enjoy fuel-efficiency and optimal performance, and comfort and safety for your passengers.
Just like Liban Coach. Choose a Scania for your bus operations.
You have seen how it works. Now it is your turn.
Download the Scania Driver app and contact us to activate your account.
Call, SMS or WhatsApp 0702 190 190 and our team will guide you.
Start improving how you drive today.
Learn more: https://t.co/9uAT9TAxzl
Scania Rental gives operators another way to manage changing demand with flexible rental periods and full support included.
Learn more about how it works, what is included, and when it can support your operation.
Read the full article. https://t.co/rfvYKPlXyc
Every litre of fuel, every brake application and every decision behind the wheel has a measurable impact on your operation.
Our driver training programme focuses on practical techniques that improve efficiency, safety and productivity over time. When drivers learn to operate with control and consistency, fuel costs reduce, vehicle life improves and downtime becomes more predictable.
This is not theory. It is a structured way to improve how your fleet performs every day.
Do not leave performance to chance. Enrol your drivers today: https://t.co/eVkpJHxWvj https://t.co/c7tujjBIg5