Launch table is out. The two-million-pound launch table is heading to the Integration Facility for inspection and adjustments to support our future ConOps. Once reinstalled at the pad, it'll be outfitted with the first stage aft umbilicals and tied into the water system, which delivers water injection just below the engine nozzles.
Some questions have come up on the launch bridge. It is in good shape and we will reuse. Three cranes are positioned to help lift the almost four-million-pound launch bridge and the two-million-pound launch table out of our flame trench and onto self-propelled modular transporters. Last night, the launch bridge was removed. The launch table is up next. Enjoy the crane ballet.