BAART Big Ass Adjustable Raptor Table for work in the booster skirt and Raptor installation completion
Grover the "winged" Grove GMK 7550
Maarvin the SpaceX logo'd LR 11000
RIP Raptor Installation Platform for lifting Raptors up to the skirt.
TRIP Truck RIP for ship Raptors
Here it is...and I only cut the end tank farm vents out...it was quite venty, mostly due to unusual amounts of pre-fill tank farm activity. Anyhow...B24 cryo #1 under the belt!
@LabPadre
Currently editing last night's video of B24's cryo test at Massey's. I set out with the intention of recording the entire thing...from first farm vent to last...but it's going to be too fast to watch I think...I may have to cut the start and end short...
Ship 44 underwent a double round of cryo testing at Massey's over night. I just don't have any more time today to catch and edit the remaining footage. Apologies!
@LabPadre
Loads of you have asked me about a timelapse of the GB build...and if there's one in the making. I can confirm... @jmanfloppy is on the case, with this start-out timelapse posted in early August. Give the guy a follow, and you'll not miss any updates!
With space vacated by Ship 44 (now at Massey's), Ship 46's payload/nosecone section has been moved in, after arriving in the ring yard yesterday.
@LabPadre
At Production earlier, the front door for the cam facing doorway has been staged for lift. Sad sighs were heard from here!
Also, inside MB-2, the 2 raceways for Ship 45 have been staged on the rear of the ship work stand.
@LabPadre