$XEET is live.
CA: 6HFJ5sxVoEtczr9siAUeGssmpfhQSS3pEoBcCycUpump
Hover any $ticker on X - chart, liquidity, risk checks and a buy button open on the post. One tap. Your wallet signs it, we never hold your keys.
Solana + 9 EVM chains. 0.5% flat.
https://t.co/sRVrhxRbeV
https://t.co/quA50JMTZD
Day one, in numbers.
$4.09M traded. 58,168 swaps. 2,277 wallets holding.
Peak was a $1.06M market cap. It sits at $43K now - day one did what day one usually does, and pretending otherwise would insult everyone who watched the chart.
Here is what did not move: the extension is live in the Chrome Web Store. It trades from the X timeline on Solana and nine EVM chains. The whole source is public at https://t.co/tBlKqdB7bA, and the panel that opened on your post this morning opens the same way tomorrow.
Most tickers spend day one promising a product. We spent it shipping one.
CA: 6HFJ5sxVoEtczr9siAUeGssmpfhQSS3pEoBcCycUpump
solana:6HFJ5sxVoEtczr9siAUeGssmpfhQSS3pEoBcCycUpump
$60K market cap.
$3.6M traded in a day.
A working product in the Chrome Web Store.
Source code public.
One of those four is rare. All four together is the whole thesis.
CA: 6HFJ5sxVoEtczr9siAUeGssmpfhQSS3pEoBcCycUpump
The usual way: copy the contract, new tab, search, paste, pick the right one of three with the same name, set the amount, buy. 13.4 seconds.
With Xeet: hover the ticker, tap the amount. 4.6 seconds, and you never left the post.
Both takes are real, recorded back to back. The long one plays at 1.5× in the video - the clock on screen counts real seconds.
Try https://t.co/sRVrhxRbeV
$XEET pays for itself.
CA: 6HFJ5sxVoEtczr9siAUeGssmpfhQSS3pEoBcCycUpump
Hold it → you trade at 0.25% instead of 0.5%, on every chain.
Everyone else's fees → daily buyback, burned, tx posted here.
The extension is already live. The token just makes it cheaper.
Your trade, drawn the second it lands.
Both legs, the percent, in and out. Computed on your device from your own history — no number unless we saw the buy.
Example above. Next update.
The Xeet repository is public.
The extension, the landing, the build scripts - all of it, at https://t.co/tBlKqdB7bA.
You can read what runs on your timeline before you install it: what the panel asks the network for, what it stores, what the one-click account can reach and what it cannot. The safety screening, the routing, the fee — all of it in the open.
An extension that sits on https://t.co/6XmVVJqzNl should be something you can read, not something you trust.
The Xeet repo goes public soon.
Extension, landing, build scripts - all of it. An extension that sits on your timeline should be something you can read, not something you trust.
0.5% per swap. The same on Solana, the same on Ethereum, the same on everything in between.
No spread hidden in the quote, no fee that changes when the trade is bigger, no tier you unlock by holding something.
One number, and it is on the panel before you tap.
$XEET is live.
CA: 6HFJ5sxVoEtczr9siAUeGssmpfhQSS3pEoBcCycUpump
Hover any $ticker on X - chart, liquidity, risk checks and a buy button open on the post. One tap. Your wallet signs it, we never hold your keys.
Solana + 9 EVM chains. 0.5% flat.
https://t.co/sRVrhxRbeV
https://t.co/quA50JMTZD
Xeet is in the Chrome Web Store.
Hover any $ticker or contract address on X and the panel opens on the post: chart, market cap, liquidity, the safety checks, and the sizes. One tap buys. Your own wallet signs it - we never hold your keys.
Solana and nine EVM chains. 0.5% per swap, the same on all of them.
https://t.co/quA50JMTZD
Xeet is a Chrome extension for X.
A ticker or a contract address shows up on your timeline. Instead of opening a new tab and hunting for the right one, you hover it: the chart, the market cap, the liquidity and the safety checks open on the post, and an amount is one tap away. Your own wallet signs every trade - we never hold your keys.
Solana and nine EVM chains. 0.5% per swap, the same on all of them, and nothing else.
There is no token and no contract address. Any address you see in replies or DMs is fake, and every announcement will come from this account first.
Days away.
We're in the last stretch - final testing on Solana, then it ships.
Xeet is a Chrome extension that turns the timeline into the terminal: hover any $ticker or contract address, get the chart and the sizes, buy without leaving the post. Non-custodial, 0.5% flat.
Soon.