Independent, principal-led advisory in mining and oil and gas. Forensic analysis for operators, investors and sovereigns. Every number traced to its source.
US commercial crude inventories rose by about 1.9 million barrels in the week to 17 April, with the WTI curve in steep backwardation.
A curve this backwardated is asserting a prompt tightness the storage data does not yet confirm.
The signal to watch:
https://t.co/hQCucW0Ni2
McKinsey's Exhibit 6 shows equipment availability gaps of 3 points for haul trucks and 6 for shovels; its text says five to six. Exhibit 1 puts Africa at 72% of tantalum output; USGS 2024 data give 85% (ZMK calculation) and list African reserves as NA.
Source: McKinsey; USGS
Slide 41 of Eramet's May deck calls Centenario's ramp-up "a proven playbook for Eramet's project execution capability".
Slide 42, under Execution, lists a "Non-demonstrated track record in brine production, ramp-up & project delivery".
Eighty-Three Days:
https://t.co/CE9vKDFree
Ero Copper (26 Nov) suspended all Tucumã production on a regulator's notice. The low end of group guidance, 67,500t, needs 14,553t more in Q4. Caraíba's ceiling supplies 13,436t, so Tucumã must still deliver 1,117t (ZMK calculation). No restart date is given.
€2,513m of Eramet's debt falls due in 2028 and 2029. The €500m raise is designed to clear the June 2027 covenant test; the 9 November roadmap does not say how those maturities will be refinanced.
Our Field Note:
https://t.co/wsZ9Uy7Riy
https://t.co/EIHVtBTqLM
Nothing has been tried and Radiant denies wrongdoing. Incomlend, which lent over US$30m against two purported Glencore invoices, has applied to withdraw its suit; the hearing is 30 Nov.
How much of your book survives one direct call to the buyer?
https://t.co/l9l47KGveF
Mizuho bought US$95.5m of Radiant World invoices in June and asked for Glencore to confirm them.
The reply Radiant forwarded on 6 Aug had dropped Mizuho from the copy line. Its banker wrote to Glencore directly, and that evening Glencore said it had no record of the invoices.
Radiant's own management statement for the Singapore court showed US$1,070m of current assets against US$598m of liabilities.
Take out US$251m due from Vitol and Glencore, who dispute some of it, and US$210m due from three related companies, and US$10m is left (ZMK stress test).
How is a subsea oil field built, run and removed? Life of Field follows one development from spoolbase to seabed to final lift.
Watch it, and six oil and gas briefings, on the ZMK Advisory YouTube channel.
https://t.co/MOK8WQTpEE
https://t.co/EIHVtBTqLM
Ore at Chile's copper concentrators averaged 1.38% copper in 2000 and 0.69% in 2025. The same copper now needs twice the rock.
From our Life of Mine briefing:
https://t.co/4JxDa27Mfi
Tanzania's Mwanza refinery bought 2.995 tonnes of gold in 2025: about 1.7 per cent of nameplate on our calculation, for want of feed.
Mali's Sénou refinery has 200 tonnes of capacity; industrial output was 42.2 tonnes in 2025.
Sized beyond the gold:
https://t.co/a8CV1fa1eZ
Mali seized three tonnes of Barrick's gold (about $245m), jailed four employees and issued an arrest warrant for its chief executive.
Barrick took a $1.04bn charge, then paid about $430m in November 2025 to regain control.
Sovereignty, priced:
https://t.co/a8Sl18FRmY
@DarioCpx October's customs data backs that up: China imported 41.94 Mt, about 9.88 mb/d, the most since March, and went back to stockpiling for the first time since July. Jan-Oct imports are still 15% below 2025, so there's room to keep buying if price allows.
@GBBC_UK Both are annual totals per importer, not per shipment: EU 50 t of CBAM goods a year, UK £50,000 over a rolling 12 months from 1 Jan 2027. Since the UK line is by value, a lower aluminium or steel price lets an importer bring in more tonnes before it must register.