bald bröthers presents: bald terminal
a new way to explore everything the Hyperliquid ecosystem has to offer - with much more still to come.
public sign-ups are now LIVE for a limited time.
baldiö ✨
https://t.co/OdMluhybsh
$DOOD will be launching on Solana 🔜
we’ve optimized for a smooth experience and will be airdropping $DOOD to eligible communities, whether you’re a current Doodles NFT holder or a New Blood community member.
here's how to get your airdrop ↓
I will make it simple :
HYPE to 50$ this year is the most obvious trade this year. And that's the bare minimum
An L1 that went from 100M to 2.2 billion deposited USDC in one year still waiting to have its token listed on CEX competitors and that aims at becoming the house of ALL finance.
The Hyperliquid team has built an incredible DEX in a matter than less than 2 years, developping nodes, staking and EVM with the fastest delivery in the ecosystem. Reactivity to market trends by listing $TRUMP and so-on all that by listening and giving back to the community
And there is still so much to be built. So much space for growth. Job's not finished.
If you can trade perpetuals + stocks on Hyperliquid but not anywhere else + without needing any KYC where do you think money will rotate to ?
Future of finance.
announcing: gigaverse is coming to @AbstractChain, the home of consumer crypto, and the game is ready to launch shortly after their mainnet goes live.
who needs WL? lmk.
Auctioneer's sixth auction is now live.
Summoner is a 1/1 Special Character in the @GLHFers collection. His ability is Interstitial - learn how it works in our Discord server.
The NFT is also a skin factory in @playgigaverse, launching on @AbstractChain.✳️
The 'Hyfolio' to make it in 2025
1. Hyperliquid (50%)
Hype is the safe bet of the portfolio here, if you are bullish on the Hyperliquid eco its good to hold a good % of that in $HYPE.
I personally staked all my $HYPE with the Nansen validator as it's very +EV to do so -> (airdrops)
2. Liquidlaunch (35%)
I have spoken a lot with the team and I'm rly impressed with what they have build in the past and already have build out with LiquidLaunch.
The bet here is that LiquidLaunch will become the largest fair launch platform on the HyperEVM.
The $LIQD token will get revshare from all revenue generated on the platform. Pumpfun is one of the most profitable operations in all of crypto. Do the math ;)
A big misconception about $LIQD is that they are just a HFUN competitor.
In reality they are a $HFUN, $VAPOR and $LAUNCH competitor in one. I have seen this team ship at a pace that I haven't seen in a longtime and I genuinely believe this team can pull it off.
I would strongly recommend listening to some of the recent spaces they did / reading back what the founders @JoshDev0 and @lordshisho we're yapping about in the discord. This will build a tremendous amount of conviction and you'll understand why I can't shut up about @LiquidLaunchHL.
3. HYPIO (10-15%)
HYPIO is a bet on the Hyperliquid culture and it's growth. Team is goated:
▪️Team is crypto native and understands how CT works on a deep level, just look at their tweet game from the last 24h. It's unmatched by anything we have in Hyperliquid so far.
▪️Team members are OG milady community members and still have very deep connections with the Milady community.
▪️Art is just on another level -> I think we'll see many people rock these as their pfps in the Hyperliquid community which will amplify it's growth.
@HypioHL
4. PIP (0-5%)
$PIP is by far the best art project on Hyperliquid, community goes way back and has been through a lot already (bullish).
If HYPE runs PIP will likely run with it as one of the leading memes on Hyperliquid.
Risks
The main 2 risks I see are the following:
▪️The bullmarket top already being in.
If this is the case we might get one or two proper pushes up before we nuke hard.
To be clear I don't think this is the case but It's something to be aware of.
▪️A Hyperliquid black swan, if Hyperliquid would get exploited for some reason it would send this entire portfolio straight into goblin town.
Again I don't think this is likely at all and trust Jeff and the team that Hyperliquid is safe and sound.
Personal portfolio
I have designed my portfolio in a very similar way to the %s described per project.
As you might have noticed, I don't hold a lot of projects in the Hyperliquid eco.
Two reasons for this:
▪️I think most projects in the spot eco suck atm or don't have a good risk/reward. I like HFUN for example but I think there is better R/R plays like LIQD.
▪️Concentrated bets > spread out bets.
I prefer concentrating my liquidity on a few projects rather then spreading out over 20 projects.
The advantage is that I know every little detail about the projects I hold and have clear invalidations for each of my positions which I can monitor constantly.
If you have 20 positions this is much harder to do in a good way.
This is just personal preference and has worked very well for me.
I'll be selling on the way up, I'm here to make money just like everyone else.
Make sure you have clear targets at which you will sell x% of your position. There is absolutely no shame in selling.
I have been very public about the positions I take and think this might help to see where my conviction lies.
Hyperliquid
GMeow! Here's a quick recap of Liquid Launch highlights from this week:
✅Shipped: Testnet platform released to the public
✅Launched: $LIQD
✅Published: Q1 Roadmap / Whitepaper
✅Teased: AI Agents
➡️ Upcoming: X Spaces
Are you ready for next week?
I admire what @cobie is brewing on @echodotxyz. This platform is already fueling and supporting solid builders in the space!
One project that caught my attention is @megaeth, which raised a total of $30M in funding.
What really is MegaEth?
Repost and open this thread 👇🏼
✺ I've just signed the bio/acc manifesto ✺
It's time to accelerate the #bioacc movement - from wetware, to software to dreamware 🧪
Join me in signing the manifesto and accelerating biotech ➠ https://t.co/fjkqqGO7AK
Henlo 🐸
Today we are very pleased to share some updates regarding the Apu NFT Collection!
First and foremost we have teamed up with the one and only OKX to help showcase the Apu NFTs to their platform! We will be airdropping a total of 75 Apu NFTs to OKX Wallet Users via the event linked below. Make sure to visit the OKX website to find out more details!
https://t.co/21NdCUukex
Now, let's get down to some minting details;
- Dates;
Whitelist Mint starts on October 26th, 12pm EST
Public Mint starts on October 27th, 9pm EST
- Price;
WL Mint: .05 ETH
Public Mint: .1 ETH
- WL Update;
The Whitelist has been updated to better accommodate long term Apu holders, with a bit of wiggle room for those who have recently jumped in with size and are trusting the plan. As it is now, the requirements to get on the WL are;
1. Be a holder who held at least $50 worth of $APU back on September 20th, 2024 (This is approximately 175k $APU)
2. Be a top 7,777 holder on the date of October 14th, 2024
Both these list were merged and then scanned for any bot addresses which have been removed.
A big thank you to our incredible community for being so patient and supportive. We are so incredibly excited to see these NFTs lands into the hand of our community where they belong. Make sure to check out https://t.co/a4ptNaeUJF for details!
This is proof of my account ownership and participation in @ArkitektLabs First Launchpad Whitelist Event.
Unlock Your Future: Be Early or Be Forgotten.
One Minute Now, Change Your Life Forever.
ID: 0000000
https://t.co/IhutDleEKe