I installed a towel rail and immediately it was tripping
Tested continuity on the screws as I thought I hit the cable, and both left side brackets had continuity to neutral๐คฃ
My screws missed, but was in the metal, that's why I got continuity, the drywallers had dibs.๐
How long would it take you to 2nd fix all of this?
15x single sockets
1x 2 gang dimmer
1x 6 way grid switch.
1x heat alarm
3x smoke alarms
7x pendants
3x batten holders
2x thermostats
2x flex outlets
1x Towel rail fused spur
1x tv/bt
Did it in around 6 hours. Was I slow?
Double socket spur from the grid switch had no earth.
Someone put it in a connector block, I connected it back with the others. And the RCD tripped.
How lazy do you have to be to not replace a bit of cable? This is on a new build that hasn't even been sold yet.
Backbox upside-down, cover the right way up. Four was done this way.
How thick do you have to be to keep fitting it, knowing it didn't work the first time.
The number of people who go bankrupt every year because of medical bills.
Norway - 0
UK - 0
France - 0
Spain - 0
Portugal - 0
Denmark - 0
Australia - 0
Iceland - 0
Italy - 0
Finland - 0
Ireland - 0
Germany - 0
Netherlands - 0
Sweden - 0
Japan - 0
Canada - 0
United States - 643k