@NytoP2PMwangi Weeh, Noma You think that way π«‘but for benefit of doubt π€π§...the stretch plus the terrain cannot be compatible with that of the expressway... The cost of construction per square meter or kilometers depends on a wide range of factors, e.g transportation, procurement e.t.c think
Chair is 10k
Table goes for 15k
Mouse pad is 1k
Laptop based on your work 27k
Monitor at 24inches that's 15k
Transportation ....that's a hidden cost
Total that's 68k shillings but that should go with a small carpet for the feet at 1,000 shillings
@Pips_goddesss Chair is 10k
Table goes for 15k
Mouse pad is 1k
Laptop based on your work 27k
Monitor at 24inches that's 15k
Transportation ....that's a hidden cost
Total that's 68k shillings but that should go with a small carpet for the feet at 1,000 shillings
@CollinsOmo30163 Just understand the difference between architecture and civil engineering...one is the ocean waves and the other one is the ship floating above it's surface. They work together but they aren't the same
Just understand that window and light play a key part of how someone interacts with the space around, too much causes discomfort and a little of it causes mood shift...You have to embody the client and design from his perspective but also be creative enough to stand out.
@CollinsOmo30163 Just understand that window and light play a key part of how someone interacts with the space around, too much causes discomfort and a little of it causes mood shift...You have to embody the client and design from his perspective but also be creative enough to stand out.
@CollinsOmo30163 Bedroom 4 instead of having the 2 (2') window replace them with one horizontal one on top of the bed space and expand the main one to allow enough sunlight and light into the room. This increases privacy and also stylish