@basedchegaluvr@NewFifeRight14@PolitlcsUK High risk buildings over 18m are now considered HRBs requiring the entire design of the project to go through to gateway. Document B fire safety isn’t the reason as to why buildings are taking longer to build, it’s the councils taking a long period to review and sign off design
We're thrilled to have @hahayes join as Presenting Sponsor at this year's X Takeover event!
Join us & RIZO 🦔 for the BIGGEST Tesla event of 2025
July 26th 🗓️ | San Mateo, CA 📍
Tickets 👉🏼 https://t.co/T5sY3Z9t2o