This unique solution to quick health care construction is modular and can be assembled without disrupting local hospital patients and traffic. By being mostly preassembled, there is a massive reduction to construction time, noise, and dust.
https://t.co/IFEseGYRP2
A&S provided #MEP engineering design services for an 860 SF TV/video & radio studio, part of a major healthcare facility's atrium. We coordinated with hospital sound, A/V equipment, and low voltage systems.
DRS Architects is the architect for this project.
Come learn practical HVAC changes you can make as a business or building owner to protect your team and customers. Join our free webinar next Friday!
https://t.co/KHjxoHXrUE
#freewebinar#HVAC#reopening
This week’s Project of the Week is an ASHRAE Level 2 energy audit of the DEARNG training site dining facility in Bethany Beach, DE., including MEP systems and a site evaluation, utility bill analysis, suggested energy savings modifications, and code violations report.
An informative look at some of the major strategies in how hospitals are designed to control and contain infection and disease.
https://t.co/CWmI1Ncjtl
Filtration systems are the key to clean water but to protect against viruses enhanced plumbing design is required. Read our recommendations for filtration and more.
https://t.co/g5C36Ilo9L
How a building is designed not only reflects a vision for the exterior and the function of the interior, but also has a major impact on the health of the people working inside. See how electrical design impacts public health.
https://t.co/x6OvP7IbM8
A building’s design has a major impact on the health of those working inside. Our series examines how enhanced MEP standards, like those in the WELL program, can impact the spread of viruses.
https://t.co/HLfRmlQuSO
Ventilation standards in health care buildings are always being improved. Here is an overview of some of the newer updates (both proposed and approved) to ASHRAE’s standard for Ventilation of Heath Care Facilities.
https://t.co/Ix3eBG5IHg
Project of the Week: Allen & Shariff added a 600-boiler-horsepower boiler to the Children’s Hospital steam plant. The total capacity after Boiler 5 was installed is 2,600 boiler horsepower. The plant feeds the hospital, research center, and administrative buildings.
Project of the Week: Allen & Shariff Engineering provided MEP and fire protection design for this 30,000 sf project. The renovation/fit-out includes the second floor of the Melford Plaza Building located in Bowie, MD.
COVID-19 quickly changed our daily lives, but it will most likely continue via changes made in building design. From updated ventilation systems, to touchless technology, to rethinking office layout, this article explores some possible design improvements:
https://t.co/NNbP471L3G
Project of the Week: Allen & Shariff provided MEP and fire protection engineering design services for a new, 9-story, 318,000 sf office building located at Bakery Square, designed to achieve LEEDv4 Gold certification. Architect: Strada Architecture; Developer: Walnut Capital.
Project of the Week: Allen & Shariff was responsible for the MEP (including geothermal) and IT security design for the construction of the new Fairmont Heights High School, which also included new athletic facilities (stadium, soccer field, baseball field, and amenities).
Very proud of our team remotely connecting from the safety of their homes to continue providing peerless service for our customers.
Here’s a glimpse at some of our teammates’ remote offices (and, possibly, some of their new “coworkers”) as they work hard for you.
Climate change has caused extreme temperature shifts in many parts of the world. These shifts, “weather whiplash,” pose some very difficult challenges to the durability and future of building design.
https://t.co/qpE0mYAJ8I