@CityPowerJhb Stop worrying about load shedding and get the operators out to site. Northriding has been off for over 24 hours now and still no operators have been dispatched. This is becoming ridiculous.
@CityPowerJhb I wish that City Power has common sense to the blatant lies that they throw to their customers. It is now 19H00 with no further feed back on RMU566 cable replacementment. What now??????
@CityPowerJhb How can we switch off something that has no power already. Why don't you restore the power instead of just working about load shedding. We have had 1.5 hrs power in the last 48 hrs. CPWEB4084298
@CityPowerJhb How about getting the dam electricity repaired instead of just making excuses. We have had a total of 1.5 hours of power in the last 48 hrs. Will CP replace the broken appliances?
@CityPowerJhb Can City Power please rectify the outage in Northriding A.H. instead of asking to switch off heavy appliances. CPWEB4082212.
Get your act together
@ewnupdates There will be less load shedding at his residence. He does not grasp the effect his words have. He has been on a road trip to all the stations but can not grasp,load shedding, the effect it has on the country.
@CityPowerJhb Why would load shedding affect the repairs? CP controls the switching on and off of the switches. Please try and think of new excuses. The old ones are now boring
@CityPowerJhb Why can City Power not admit that they can not run the load shedding. Why do something that is not working. Whose "couches"are getting lined?