@Siege4570 Strong multi-year government anchor demand (fixed launches for strategic + constellation satellites) these deal can make more interest in private companies and these launches are must as Making an Bahubali LVM 3 is very cost effective
( 2/2)
@Siege4570 Just transferring the technology isnโt enough. Without guaranteed government launches for the first several years, shared use of existing ISRO facilities, and some financial support, that's becuz earlier LVM3 tech transfer failed with private companies (1/2)
Technical specifications ;
Primary Mirror: 2.4 meter aperture (identical diameter to the Hubble Space Telescope).
Wide Field Instrument (WFI): 300.8-megapixel focal plane array powered by 18 HgCdTe (mercury-cadmium-telluride) detectors.
Main reasons it got delayed
A German design consultant was hired to finalise the drawings for Kinet. Official said this consultant was late in giving the fully approved design. This is one of the quieter reasons the project slipped by more than two years from the original plan
The countdown is officially ON! Only 3 months until the 20th Asian Games kick off in Aichi-Nagoya, Japan ๐ฏ๐ต
Our athletes are giving it everything they've got to make India proud at the Asian Games. Time for us to show up, support, and back the team! Let's go, India!๐ฎ๐ณ #AsianGames