Using Argand's GridMap software we worked with a client in Mexico (with significant constraints on imported energy) to model a 'peak shaving' strategy to demonstrate the size of battery required to keep imported energy levels within the contracted demands of the Network Operator
Argand complete two G100 v2 projects for Domino's Pizza on behalf of Eden Generation. Complexity of G100 v2 & physical metering challenges of high voltage connected sites, utilised Argand's grid connection & control expertise to meet the DNO's NGED & Scottish Power requirements.
Argand release a real-time, dynamic visualisation tool for all clients, showing exactly how energy is flowing between on-site generation (solar, wind, CHP) and, grid & on-site loads. Call Argand Solutions on +(44)1803-864706 or drop us a line at [email protected]
Zero export G100 v2 site goes live at Diageo Leven. Our client Quartzelec was able to install 3.3 MW of solar PV at Diageo's site in Leven, Scotland as a direct result of utilising Argand's G100 v2 ENA-approved GridGEM export limitation solution. Can we help you? +(44)1803-864706
GridGEM G100 v2 = DNO approval for large scale battery project. We've worked with Thrive Renewables to commission a 20MW import/export battery storage facility under the new G100 v2 regulations. More about GridGEM click link or call +(44)1803-864706 https://t.co/vt4K1yGSwd
Announcing GridLENZ v2 monitoring & analytics interface, integrating feedback from our clients to provide more detailed charts & analytics to facilitate better decisions. Take a look at the key features in the video and call our team for more information on +(44)1803-864706.
Argand Solutions' GridGEM is now G100 v2 compliant, type-tested and approved by the ENA and with over 30 G100 v2 projects live since the regulation became effective, we're here to answer any questions that you may have. https://t.co/vt4K1yGSwd or watch https://t.co/s328zM7sOD
GridGEM is now ENA Approved for G100 Version 2 Export Limitation
#g100#exportlimitation#energynetworks#energystorage#renewables
Pleased to announce that Argand's GridGEM is now G100 version 2 approved by the ENA for export limitation. We've worked re…https://t.co/n2plvrfkxW
Argand gets ANM APPROVAL with UK Power Networks
Really excited to announce that Argand Solutions has been given pre-approval to provide Active Network Management (ANM) interface solutions for clients connecting distributed generati…https://t.co/QuQJKMm6ty https://t.co/kJofBAgU2t
Another complex G100 project completed at Plymouth Marjon University for Mole Energy Ltd - helping the University to become one of the leading low carbon places to study. Case study available at https://t.co/4TV5FpC98g.
#university#energy#g100#constr…https://t.co/LLyPN9uOeF
Amazing job by the Argand Solutions team to design & supply G100 HV constraint management interface for Keele Uni via ESE Ltd
#g100#exportlimitation#highvoltage#energymanagement
https://t.co/UvJMszjdjg https://t.co/Qw2tgUV3nQ