I went back to write the exams in pain. God did! I'm getting much better now and I'm hoping for full recovery.
Sickle cell might have won the battle, but I've won the war.
Reintroducing myself: Audu Joshua Oluwaseun (PMNIQS) B. Tech Quantity Surveying, FUTA (Hons) 4.43/5.00
Not to make you feel better, but I've been on the sick bed since April 20 treating sickle cell complications. Meanwhile I was suppose to be wrapping up my last semester in the university and graduate with a first-class degree.. But all is well!
Ever since I graduated and started practising, I have never had the opportunity to use my BESMM. Perhaps someday, a project will come along that requires it.
Most of our site engineers actually preferred staying on-site rather than coming into the office. Mistakenly step into the office, na there HR go tell you say you’re not properly dressed, your shoes are wrong, you’re late, etc.
“Say NO once, and they might not call next time when you actually need it.”
Last year, while battling my health in the hospital, a lucrative gig came in. I couldn't risk turning it down, so I accepted, subcontracted it to a colleague, and did the final checks from my sickbed.
Anytime I tell myself I’ve tried enough for the week and I’ll use the weekend to rest, this man will call and say, “QS, I have work ooo.”
And I can’t even say no because that’s my hustle. Say NO once, and they might not call next time when you actually need it.
Missed today's convocation because a gig took me outside school. But I'm not missing next year's because I'll be among those being celebrated.
Next year, it's my turn! 🎓
Measurement Hack 101:
Working with drawings that lack sufficient design information can make you assume that incomplete details are the norm.
Don't let repeated exposure to inadequate drawing information make you overlook essential details. Always scrutinise drawings thoroughly before making reasonable assumptions where necessary information is genuinely missing.
If not for quantity surveying, what would I have become? 😂 To think I knew absolutely nothing about the course when I selected it on my PCE form that year! 😀
This new role is kind of interesting, though.
No more staying late on-site. I go to site at my own pace, whenever it’s convenient.
My phone is no longer buzzing with calls from suppliers and engineers.
No more chasing deadlines with sanctions attached. 😤
My company says, “Enough of you being a Quantity Surveyor. We need you as an Assistant Project Auditor for construction projects!”
Well, let’s see how this goes. 😌😩
WHY ROOF AREA IS NOT THE SAME AS FLOOR AREA
Your building has a floor area of 150m².
Does that mean you need 150m² of roofing sheets?
Not necessarily.
Roofing measurement is based on the actual sloping roof surface, not simply the horizontal floor area.
Before estimating roofing materials, consider:
🔹Roof pitch (slope).
🔹Number of roof sections.
🔹Length of overhangs.
🔹Hip, valley and ridge details.
🔹Roofing sheet profile and effective coverage width.
🔹Cutting and laps.
A building with a simple roof design may require less roofing material than another building with the same floor area but a more complicated roof structure.
Never estimate roofing sheets from floor area alone.
Save this before your next roofing estimate.
Building A: 210m², with 21 columns,
Building B: 160m², with 32 columns designed
You’d expect Building B to cost less because of its smaller size, but that’s not always the case.
Construction costs depend on several factors, with the size of the building being just one of them👷🏾♂️
@AwolowoSenator Column bases with its ancillaries will humble you. Alot of hidden materials, labour and uncertainty will definitely happen with more columns.
What about concrete and it's ancillaries?