We've hit 50,000 members on Twitter! To celebrate, we're hosting a massive Airdrop of 100,000 SolarX tokens.
To participate, Check the link below:⬇️
https://t.co/6WKXakpVvc
We've hit 50,000 members on Twitter! To celebrate, we're hosting a massive Airdrop of 100,000 SolarX tokens.
To participate, Check the link below:⬇️
https://t.co/6WKXakpVvc
We've hit 50,000 members on Twitter! To celebrate, we're hosting a massive Airdrop of 100,000 SolarX tokens.
To participate, Check the link below:⬇️
https://t.co/6WKXakpVvc
Hey @binance wanted so bad to attend the binance blockchain week istanbul, my friends will be there, but my payment kept getting rejected and while talking to customer support to resolve it, in the end i get a respond tickets sold out, hope you can help me find a solution.
#dxy#usd
🦅Still expecting the drop, we started good falling into 105.5 but the CPI report gave us the push up, overall we expect higher DXY, but we want to play the pullbacks aswell so we monitor them. 🦅
#EthBtc#alts
🦅We had a breakdown, so falling wedge setup is invalidated, but a dead cat bounce is still in play until we hold our last line of defense 0.056-0.053 check 2017/18 aswell, the moment that level fails welcome to la-la land.🦅
#BTC#USD
🦅We got that move up, but not pre cpi, but post cpi, recalim of 27.5/27.6k is crucial if we want to move higher, otherwise a hawkish Fed tomorow can send us strong down, but if Powell talks as allways in riddles we gona continue sideways in 25-30k range.🦅
#EXY#Euro#DXY#Dollar
🦅The euro index is telling us, its getting ready for a downtrend cycle, usally in the past we allways confirmed that with a bear div in rsi, only question is will we have a last push up to create that bear div or start the move down without it.🦅
#btc#usd
🦅4 days left nothing has changed for btc in M we bounced on our M target ma10/55 that will be our support in september and ma21 our resistence, this ma squezze in sep/oct. will decide is this a HL {higher low} in M or we dive lower for a posibble doubble bottom. 🦅
#dxy#usd
🦅4 days left until M close, for now looking strong, a close above ma10/21 above 103.4 is bullish {can be tested as support in september}, a close above 104.3 is bullish, because we close higher then the last LH {lower high}🦅
#dxy#usd
🦅DXY: We have breakout from the falling wedge, but like we mentioned in previous updates a reversal in trend only after we get a W close above 104.5🦅
#btc#usd
🦅We moved up as planned not into our target, but what matters is the right direction, btc currently is getting heavy again, i want still to see 27-28k before a further dump into 23-24k, but if you trade here, dont do it without a stoploss.🦅
🎉Thanks @traitsnipergame
💎Wow, my Twitter account is worth a fortune! How about yours?
🔗 Claim your airdrop $TS here 👉 https://t.co/GpN808UyGD #Traitsniper#TS#33LN4DVG