I had never cared this much about my country until this old man from the South came along. And I never knew I had so much love locked up in my heart for my motherland.
A “Dictator” taught us selflessness.
@teddyboylocsin Hi Sir,why it is so hard to get an appoinment for passport renewal at Philippine Embassy in NZ? Palagi po fully book yung slot tapos hindi pa nila ino-open yung slots for December. I sent them an email kung kelan nila e open sabi e check lg daw from time to time.
D ko talaga ma gets yung mga tao na sumisigaw ng Mass testing, na kesyo Mass testing daw does not mean ALL naman. Hello, my TARGETED testing na nga na ginagawa which is synonymous sa MASS testing na kinukuda nyo dba? ano pa ba? 🤷♀️
@marilou83198593 @kapeharold27 @143redangel meron na nga targeted testing na ginagawa which is synonymous sa pagkaka intindi nyo ng mass testing, ano pa ba?
@kapeharold27 @143redangel Ok, so let's consider na MASS testing does not mean ALL, At meron na nga targeted testing na ginagawa which is somehow synonymous to mass testing na sinasabi nyo, bakit pa kayo sigaw ng sigaw ng mass testing e my targeted testing na nga?
Doon sa nag sasabi na tiniming daw talaga ang pagsara ng ABS sa crisis na nagyayari ngayon e marami mawawalan ng trabaho at magugutom, aba teh, Ang franchise expiration nka schedule yan. Sana sinabihan mo si Covid na sya mag adjust. 🤷♀️🤷♀️
Doon sa nag sasabi na tiniming daw talaga ang pagsara ng ABS sa crisis na nagyayari ngayon e marami mawawalan ng trabaho at magugutom, aba teh, Ang franchise expiration nka schedule yan. Sana sinabihan mo si Covid na sya mag adjust. 🤷♀️🤷♀️
@143redangel @iMthinkingPinoy @trxangeles@lenirobredo@loren_legarda Hi Miss Angel, Salamat po at napansin nyo tweet ko. Sa Province of Antique po Western Visayas. Angel Salazar Memorial General Hospital.