The #LiftLOK is a simple, robust, high capacity method for lifting and handling heavy loads. With an extensive track record for the remote deployment and recovery of subsea equipment, #Balltec’s LiftLOK delivers innovative lifting and handling systems. https://t.co/e28cIoNifQ
Great image of Osbit's impressive upending hinge on Boskalis' Bokalift 2 crane vessel.
We had the pleasure of working onboard with Osbit to provide the quick-connect LiftLOK tool for the upending process. https://t.co/luHLxJmCQk
#liftLOK#lifting#osbit#offshorewind#boskalis
We’re thrilled to have delivered an innovative monopile upending hinge to Boskalis, to support its latest US East Coast operations. The system is installed on Boskalis’ Bokalift 2 crane vessel and is already being used to install a significant number of monopile foundations.
Was great to meet some potential engineers of the future. It was encouraging to hear how important a future sustainable world with renewable energy is to people.
✨ Our Autumn Careers Fair is back in person! ✨
Wednesday 26th October, 11am – 3pm, LICA 📍
To see the full list of exhibitors and register to attend, visit CareersConnect - https://t.co/ZGaFWGo5om
The RigLOK mooring connector, primarily designed for the offshore drilling market, enables release under load in all operating conditions, allowing the disconnection of mooring lines to take place closer to potential weather threats. #MooringSolutions https://t.co/xibyS4r3GJ
Balltec’s mooring connectors are designed to lower CAPEX and OPEX costs by reducing installation time during mooring line hook-ups, providing the ability to disconnect the mooring line (for maintenance or replacement), and their removal at the end of the project lifetime.
While we might be best known for our innovative engineered solutions in the oil, gas, and renewable energy sectors, Balltec also offers a wide range of services related to our 40,000 ft² manufacturing facility, which has an overhead crane capacity of 35 mT.
We also offer fabrication, welding, and commissioning services, including: Factory Acceptance Testing (FAT), prototype design, testing, certifications (ABV, DNV-GL, BV, Lloyds), final commissioning, client training services and project life management services.
Balltec are heading to @SPE_OE! Our Sales Manager, Rob, and Senior Design Engineer, Adam, will be in attendance. Be sure to say hi if you see them. Look forward to seeing what's on at the show this year!
#OffshoreEurope#OE19#Balltec#EngineeredSolutions
#Balltec has been awarded a contract by Enbridge Offshore Facilities, LLC of Houston, for the Vito project, located in the Gulf of Mexico in water depths of 4,000 ft. The scope of supply is for Balltec’s #PipeLOK and flangeless subsea PIG launchers. https://t.co/Vd5el6DS6m
Happy Friday from everyone at Balltec! We know we're a little bit late to the party, but we couldn't let the opportunity go by without showing off a few photo's, taken by our talented team, of some of the views from the job. #WorldPhotographyDay