NOTHING STOPS THIS MINER TRAIN 🚨
- New miners ordered ✅
- Dubai miners en route ✅
- New miner orders funded directly from sales (this month)
- On-site installations underway
- Next wave of miners ordered the following month
This is the flywheel we’ve been building toward — momentum compounding, capacity scaling, and revenue feeding growth.
$XMW
How to mine Bitcoin || ALMOST READY 🚨🚨
The mine is almost ready: 85% complete.
We’re on the final stretch, with power expected to be live in approximately two weeks.
$XMW
Energy is the key to thriving in AI and bitcoin mining. To stay ahead in this competitive market, you need an edge. We’re tapping into the Itaipu Dam’s affordable energy, which gives us a major advantage. This ensures a long-term runway, as we won’t be hit with the high energy costs that are squeezing margins for others.
$XMW
$XMW front ran this crisis by moving to the jungle 5 years ago to build relationships with people that own the cheapest power in the world. @mediumtension's work landed preferred contracts to buy power from Paraguay's Ipaitu Dam. You don't get to go down there now and get these rates. Tick tock. The AI power demand dam is about to break.
@Fibonaccious You probably noticed energy narrative being pushed everywhere (outside of web3) - Check @MorphwareAI and what they are doing in Paraguay.
It's crazy to even compare them with other crypto projects.
https://t.co/vxFP10abUk
One of our long term loyal holders recently visited one of our Bitcoin sites in Paraguay. We are on the ground building with real miners and real infrastructure.
That sound you hear is freshly mined Bitcoin being added to our public wallet for buybacks. With our scaling solutions now live, we have unlocked capacity for major expansion.
628 miners are running today and more are already on the way.
$XMW
Over the next decade, millions of AI applications will be built and every one of them will require massive cloud infrastructure and enormous amounts of energy.
Europe is already struggling with the energy transition. Now imagine where AI workloads will look for reliable and scalable infrastructure.
We are already here. Four years ahead of the curve. Built, powered, and ready before the demand arrives.
When AI comes looking, it comes to us.
$XMW