Video inspection of a well that’s down on production. You can see below how clogged the screen is with iron. The well will be brushed and cleaned with a descaler. A new pump will be installed.
Out with the old and in with the new. New pumping station installed. MCI panel with (3) 75HP short shafts and a 25HP Jockey pump. The old station was 22ish years old.
#storrtractor#MCI
2 new 60 HP short shaft turbines and a 5HP PM pump. This customer also got a new Flowtronex MCI pump panel to start the 24 season off right.
@PreferredPump@StorrTractor
Little before and after for the pump station upgrade. All new piping, (2) 75 HP short shafts and a 15HP PM pump. Just waiting for the new panel to come in. #franklinelectric#Grundfos#PreferredPump