New York's grid operator says New York City runs short of power in 2032, and the whole state in 2033. Its report sketches two ways out and prices neither. We priced both.
The first way: build what is waiting in line. About 20,000 megawatts of batteries, solar and wind, plus new cables into the city. About $51 billion.
The second way: keep the Power Authority's small gas plants, keep or replace the Brooklyn barges, and rebuild the city's oldest plants. $5 to $9 billion, if built new.
The first is where state policy points. The second needs reliability exceptions, and air permits the state last denied in 2021. The grid operator says the answer will likely take some of both.
I am not sure why the @timesunion or the solar lobby would want to admit to me that my social media advocacy led, in part, to the cancelation of the Flat Creek Solar permit in Montgomery County, New York...
But here it is, published last week. This echoes, in some ways, what the @politico article on me last month admitted as well.
If this is true, it should give everyone on here hope that posting and covering the truth of what's happening at these solar and wind complexes causes a "local furor" that seems to prevent some of these projects "from crossing the finish line."
All this proves is that the renewable industry can only exist in the shadows with no independent journalistic coverage or transparency whatsoever.
If you start sharing bureaucratic documentation, file lawsuits, and post the experience right here on social media, these predatory corporations and the New York State government don't like it very much.
I know social media has brought a lot of negativity into our lives, but it's also a FREE tool available to every American. Use it!
These foreign corporations do not like watching us congregate and discuss these complexes on here... clearly.
At 5 PM last Saturday, 1,580 megawatts were flowing into Rochester from Niagara.
That was more than the whole Rochester area was using at that hour: 1,206 megawatts.
Most of it kept going. That hour, 961 megawatts went on east toward Syracuse. Rochester sits on the main road east from Niagara.
The base is one nuclear plant. Ginna, on Lake Ontario in Wayne County, is 582 megawatts and has been running since 1970. All week, the area's own plants never made less than 575 megawatts, day or night.
Friday afternoon, power came in from both sides, from Niagara and from the Syracuse side. It was the only day all week the east side flowed in. On Thursday, a sunny 64 degrees, rooftop solar peaked at 364 megawatts.
For the week, the Rochester area used 180 gigawatt-hours. Its own plants made 106, most of it from Ginna. 116 came in from the west, and 52 went on east.
Day-ahead wholesale power averaged $43 a megawatt-hour in the Rochester zone, against $47 in New York City.