Tamarack valley energy just lied on their annual financial report. “No legal proceedings that the company is or was party to” well except the 90,000,000$ lawsuit that I filed that they haven’t been able to defeat!
Our CEO Austin Bank joined leaders at @INVENTUREScan 2025 for a session “Data Centres in Alberta”
Alberta is primed for sustainable, high-performance digital infrastructure. At Cryptotherm, we’re helping lead the charge with scalable and efficient bitcoin mining systems.
Heat isn’t a byproduct in bitcoin mining, it’s the baseline.
CRYPTOVAULT is our 1MW / ½MW immersion-cooled container, built for harsh environments and engineered for serious performance, uptime, and heat control.
Industrial mining starts here.
Cryptotherm builds North America’s most advanced crypto mining systems using immersion cooling and heat exchange tech.
Engineered by experts in thermal, fluid, and manufacturing sciences to deliver top performance at any site, every time.
Loaded, rolling, and ready to mine Bitcoin 🔥
Cryptotherm builds high-performance mining systems for industrial-scale operations. From 1.5MW containers to compact pods, our solutions include air-cooled, immersion, and hybrid infrastructure, engineered to turn power into value!
Purpose-built for high-density bitcoin mining, our 1.5 MW Air Unit fits 420 S19s or 504 M60s in a rugged 40-foot container.
🔹 250K CFM airflow
🔹 UL-certified systems
🔹 HEPA-ready
🔹 Fully customizable
🇨🇦 Built in Canada.
Inside the box: CT220 Generators ⚡
These rugged units are the heart of our latest 400kW remote deployment — built for reliability, rapid setup, and continuous runtime, even in challenging environments.
Built. Loaded. Shipped. Another Hybrid 200 unit heading out the door!
With a 200 kW generator, room for up to 98 miners, and off-grid capability, it’s a compact powerhouse for dynamic bitcoin mining 🔥
Ready for deployment 🙌
Our 200kW Hybrid Unit is fully mobile and off-grid capable, built to support up to 98 M60s or 72 S19s.
With a natural gas generator, hydraulic lift legs & smart cooling — it’s built for scalable, efficient Bitcoin mining anywhere.
Up & running! 🔥
Want to stay up to date on what's going on at Cryptotherm? Subscribe to our mailing list for insights and updates!
Link in the replies 👇
Fresh install, just powered up ⚡
Still a little “lived in” while we wrap things up! This 400kW dual-redundant system is now online, supporting both industrial operations and Bitcoin mining in a remote location.
Our latest deployment: a 400kW dual-redundant power system supporting industrial ops + Bitcoin mining.
Fully deployed in 6 hours by 2 people, with no cranes required. Also serving as a testbed for real-time equipment monitoring + predictive maintenance.
The U.S. is building a Strategic Bitcoin Reserve stocked with seized crypto, not purchased BTC.
This article asks: could locally mined Bitcoin be the better path?
Should 🇨🇦 Canada be thinking about this too?
🔗 https://t.co/8oldaHw0m0