I didn’t get into charts because I wanted to get rich.
I got in because my money kept losing value.
Here’s the story of how a currency crisis pushed me into a world of analysis, investing, and self-control 🧵👇
📈 BTC Update
Practical example of my strategy:
✅ 20% buy at $83K
✅ 20% buy at $63K
Average entry: $73K. I still have 60% of my capital available.
I don't chase bottoms. I accumulate BTC during dips, protect my capital, and stick to the plan.
#BTC#Bitcoin#DCA#Crypto
Strategy has acquired 535 BTC for ~$43.0 million at ~$80,340 per bitcoin and has achieved BTC Yield of 9.4% YTD 2026. As of 5/10/2026, we hodl 818,869 $BTC acquired for ~$61.86 billion at ~$75,540 per bitcoin. $MSTR $STRC https://t.co/qScHXi2BBJ
📈 $BTC W Update
#BTC has reached ~$82K.
I’ve been accumulating since $63K during the sideways market.
Now change focus from buying to protecting.
If I get exit confirmation, I’ll take profits on 50% of the position and let leftovers running
Plan > emotions.
#Crypto#Trading
📊 $BTC D Update
BTC is ranging between $63.7K–$73K after a failed breakout to $75.9K.
So…breakout or drop?
Indicators show weak bearish momentum, which explains the range.
After testing the highs with volume, I see continuation → next key level: ~$83K.
#BTC#Bitcoin#Crypto
Passive LPing is pretty fun
When v3 deployed on Optimism 4 yrs ago I made a concentrated position on eth/dai from 1400-3200
I've never rebalanced, it was out of range ~30% of the time
It earned $5400 in LP fees on $4700 position size so far
Strategy has acquired 34,164 BTC for ~$2.54 billion at ~$74,395 per bitcoin and has achieved BTC Yield of 9.5% YTD 2026. As of 4/19/2026, we hodl 815,061 $BTC acquired for ~$61.56 billion at ~$75,527 per bitcoin. $MSTR $STRC https://t.co/ifGXjMeIZH
@NoahOptions For me, it starts with risk management — that’s non-negotiable.
Then comes the strategy and specialization, but those can adapt depending on market conditions.
Capital protection first, flexibility second. That’s how I stay consistent.
📖 Plans are important… but the real key is accepting they won’t go as planned.
Markets, life, and investing are full of surprises.
The best strategy isn’t perfection — it’s adaptability.
Build plans that survive reality, not just expectations.
#Investing#Mindset#Finance
🚨 Monetary destruction: Left or Right? It’s neither — it’s uncontrolled spending.
🇨🇴 Colombia (LEFT - Petro): clashes with the Central Bank over the deficit.
🇺🇸 USA (RIGHT - Trump): pressures the Fed.
As José Luis Cava says: the problem is the same on both sides. 📉
#Economy
Strategy has acquired 22,337 BTC for ~$1.57 billion at ~$70,194 per bitcoin. As of 3/15/2026, we hodl 761,068 $BTC acquired for ~$57.61 billion at ~$75,696 per bitcoin. $MSTR $STRC https://t.co/6hv6PjzOKQ
Excited to help advise the @CFTC particularly when it comes to DeFi
Last admin’s CFTC only wanted to talk via subpoenas and enforcement (see attached image)
And lots of builders on this list! A great sign for the future of the agency under @MichaelSelig’s leadership
Crypto will viciously test your conviction.
We go through entire market cycles, severe drawdowns and extreme euphoria, every few years. What investors feel in a lifetime, we experience every few years.
It’s brutally hard to manage positions. You want to be a long-term holder but the market reminds you how right and wrong you are daily.
Venture doesn’t have a ticker constantly grading your thesis in real time. We do. Every single day.
Right now, some of the most vocal believers are quitting. Throwing in the towel. Dismissing the space.
Remember this moment.
Years from now someone will scoff and say “oh yeah, you were just lucky for being early.” Being early is goddamn hard. Years ago you could’ve been too early. And being too early is indistinguishable from being wrong.
We’re not too early anymore. Read the room. Read the headlines. The infrastructure is battle tested. The adoption is happening.
And the cruel irony is that crypto natives are quitting just as non-crypto natives and new adopters are about to capture way more value than they ever will. A lot of the groundwork was built by the very people throwing in the towel today. That’s a shame. But markets don’t care about fairness. They reward conviction.
For anyone who told you that you were just lucky. None of this is fucking easy. The drawdowns, the noise, the conviction required to hold when the world tells you you’re wrong.
Learn to love the pain. Learn to love the work. Or you’ll always be a prisoner of the market and of other people’s opinions.
Find love for the game or go play another one.
If you’re still here. Still building, still creating, still grinding. I salute you.
This is a generational shift and we’re lucky enough to shape it.
Long crypto
📉BTC W Update
Second partial buy was executed at the yellow zone, as planned.
Price has now broken the bullish channel, so next buys are set at the marked support levels, scaling in with partial entries.
No rush.
Risk-managed. Accumulating on dips.
#BTC#Bitcoin#Crypto#spot
📉➡️📈 BTC Weekly:
ADX is gaining strength while the downside is losing momentum. This could open the door for a rebound.
I added my second partial buy here and I’m sticking to my plan.
Risk-managed and patient.
#BTC#Bitcoin#Crypto
Bitcoin closed January at $78,635 (-38% from ath)
200 Week Moving Average $58k
Realized Price $55k, decreasing
RSI dropped below 50, blue: official bear territory
Historically BTC could drop to 200WMA/RP levels
However bull has been weak (no red) so bear might be shallow
#BTC Weekly: first candle below the 55 EMA.
Price is now around the mid-range of the bullish channel since Feb ’24.
If the break confirms, a move toward the 365 EMA (~$50k) is possible — about a 62% pullback.
For me, this is still an accumulation zone. I’m buying supports.
#BTC price in discovery mode — difficult to knows how far it goes 🚀
I’m starting to DCA out using tiered Fib extensions.
🔹 First sell: 0.786 (~$122K)
⚠️Not advice, just my game plan ⚙️
#Bitcoin#Crypto#Fibonacci#NotFinancialAdvice
$BTC just hit a new high around $126K.
On the daily and weekly charts, I’ve been slowly scaling out of my position with a #DCA selling plan — but my monthly setup hasn’t been touched yet.
How are you managing your #BTC here? Taking profits or holding for higher targets? 👀
📈👇🏽