@jminceyturf Verify everything performed (construction details, irrigation spacing, drainage footage, etc)be prepared to be on site whenever the contractor is, test every material used before and during the project (sand, gravel, etc), establish and grow a strong relationship w/ architect.
@PatJonesTweets Revolution at 6floz/M every 4 weeks on 007 bent in WTX. Sometimes add 3/4 floz/M of Pervade with it if we are near a flush. Hydro 90 at 8 floz/M on T/F/A applied quarterly on 419 Bermudagrass. Retain Pro spot sprayed on mounds and common LDS spots on fwys as needed.
@GolfsoupJones The Stone Canyon Club! I was the Director of Golf Course Operations there in the not too distant past. Amazing property with some of the best views and golf holes anywhere.
@emcaseyturf Liquid formulation of Imidacloprid really helped me at SC in Oro Valley….We did not have a grub anywhere either. Was the only thing I ever found that kept them from tearing stuff up. Good luck!
@jvercautren I had a black layer issue big time on a course in Arizona when I started there. Did the traditional tactics like you are and also eliminated any application containing sulfur. Huge difference in 1 year.