BloombergNEF expects global grid investment to cross $500B in 2026 — a first. Hitachi Energy alone committed $1.5B to new capacity. Not just a shortage story anymore — a decade-long demand cycle. #GridInvestment#EnergyInfrastructure
⚡With 2 500 GW of wind & solar energy awaiting connection, grid infrastructure is a major barrier to scaling up #renewables.
Each investment in grids, storage & flexibility can unlock this capacity in different #TransitionPathways & help the world achieve its renewables-based electrification goal. See👉 https://t.co/VwEAp3JKfG
Same root cause: grain-oriented electrical steel, the core material in both transformers and switchgear, is severely constrained. Switchgear lead times hit 60+ weeks in May 2026,. Nearly half of planned US data center builds are now at risk because of it. #CircuitBreaker#EPC
Every headline about the grid equipment shortage is about transformers. Switchgear is just as bad — high-voltage circuit breaker lead times are near 125 weeks, worse than many transformer categories. #Switchgear#GridInfrastructure
Every headline about the grid equipment shortage is about transformers. Switchgear is just as bad — high-voltage circuit breaker lead times are near 125 weeks, worse than many transformer categories. #Switchgear#GridInfrastructure
Transformer demand up 100%+ since 2019 in US. Siemens Energy's grid order backlog just hit a record €51B. Lead times routinely exceed 2 years. Procurement timing now matters as much as price — and it's not just a US problem. #TransformerShortage#EPC
Europe's largest operational battery just went live: Coalburn 1 in Scotland, 500MW/~1GWh (CIP). First of 3 linked projects totaling 1.5GW/3GWh. The scale utility BESS is hitting now vs. even 2 years ago is notable.
More numbers: US transformer demand up 100%+ since 2019, prices up 70%+ (some classes 95%), lead times routinely 2+ years. Switchgear and breakers under similar pressure too. Procurement timing now matters as much as price. #Switchgear#EPC
A stat that reframes the transformer shortage: more than half of America's distribution transformers are already past their expected service life. Replacement demand + new demand, hitting the supply chain at once. #PowerTransformer#GridInfrastructure
A stat that reframes the transformer shortage: more than half of America's distribution transformers are already past their expected service life. Replacement demand + new demand, hitting the supply chain at once. #PowerTransformer#GridInfrastructure
Sourcing C&I storage for a Middle East project? Lead time matters as much as price at this pace. Our CDEU systems (71-160kWh) are built for it. DM for specs.
#RenewableEnergy#EnergyTransition
That kind of jump needs 3 things aligned: sovereign fund capital, mandatory storage on solar tenders, and multi-year framework contracts. All 3 are happening across the Gulf right now — part of why the region is tracking as one of the fastest-growing storage markets globally.
The Middle East's battery storage deployments are on track to nearly triple this year — ~8 GWh (2025) → ~20.1 GWh projected (2026).#EnergyStorage#MiddleEast
The Middle East's battery storage deployments are on track to nearly triple this year — ~8 GWh (2025) → ~20.1 GWh projected (2026).#EnergyStorage#MiddleEast
August heat = Peak grid demand. ⚡🌡️
Secure grid stability with the CDEU C&I Energy Storage System (71kWh-160kWh) by EUE Power. High safety, long service life, and an integrated design for flawless peak-shaving.
#EnergyStorage#GridResilience#EUEPower#Manufacturing
Meaningful conversations create future opportunities.
Looking back at LEAP East 2026 in Hong Kong, we were pleased to connect with Alendei Green and exchange ideas on energy infrastructure, sustainability, and global collaboration.
#EUE#EUEPower#EnergyStorage#PowerDistribution
Connecting global energy markets from the Greater Bay Area.
EUE Power joined Data Center Asia Hong Kong and LEAP to explore trends in critical power, distribution systems, and energy storage.
Building reliable energy infrastructure with global partners.
#PowerDistribution#Energy
Sourcing for EPC/project work inin Europe, North America or Asia? Send your spec sheet — we'll confirm certification + lead time together. 📩 #EPC#EnergyInfrastructure
Fast delivery means nothing without certification. Our transformers are CE certified (EU), UL + cUL certified (US/Canada), built under ISO 9001. #PowerTransformer#ULCertified
Lead times: power transformers running 2+ yrs in several markets. Switchgear order books filling into 2028. Hong Kong is becoming the bridge between Asia's manufacturing capacity + global buyers. (2/3) #Switchgear#EnergyStorage
The real bottleneck for AI data centers isn't the chip. It's the substation. 🧵 3 takeaways from Data Center Asia HK + LEAP East 2026 (8,000+ buyers, 35,000+ attendees) this month. (1/3) #DataCenterAsia#LEAPEast2026
AI & cloud uptime relies on physical reality. Great meeting EPC buyers at #DataCenterAsia2026 & #LEAP2026 in HK!
EUE Power manufactures heavy-duty power hardware (UPS, dry-type transformers, switchgear) strictly to your SLD.
#PowerGrid#LEAP2026#EUEPower
Infrastructure projects in Asia are accelerating. Heading to #DataCenterAsia2026 in Hong Kong on 8-9 July.
Stop split-sourcing your transformers, switchgear and storage. Get your hardware bundle from one factory.
Interested in a factory tour? DM or meet on-site in HK.
#EUEPower
Global storage additions hit 112 GW in 2025. +48% YoY.
The solar-to-storage ratio just went from 6:1 to 4:1 — and it's still narrowing.
Distribution equipment (switchgear, transformers, substations) is the bottleneck nobody talks about.
#EnergyStorage#BESS#PowerGrid#EUEPower