Founded in Spain in 2014. We bridge Europe, Asia and the Middle East in AI infrastructure, clean power and embodied AI. Incubated by Cyberport since 2024.
Spain has set a general regime for data centres with ≥10 MW grid access: 80% additional renewables and hourly matching. Storage can help; transitional rules apply.
Batteries: 35.2 GW with access, 306 MW operating.
https://t.co/gRRf6SD3sG
#DataCentres#Energy
Trust across borders is built slowly. I have been doing that work in Spain since 2006, and through East2West since 2014.
The same discipline now goes into AI infrastructure, renewable energy and embodied AI devices.
https://t.co/cUUii0NMCi
#CrossBorder#AIInfrastructure
When can an AI data centre open? Often it comes down to when power can reach the site.
Three questions we start with:
1. When will power be available?
2. How much can each phase count on?
3. What can renewables cover?
Our brief: https://t.co/G17VoeQbSh