@RAMPARKASH88883@RAVINDE13525747@cmohry@Pd2Xen@HaryanaPwd@mlkhattar The speed breaker has been provided as per requirement of the site to avoid excessive speed and to avoid any accident for the road users as there exist curve at this location. The same is as per the requirement of site.
@OfficeS54308 The speed breaker has been provided as per requirement of the site to avoid excessive speed and to avoid any accident for the road as there exist curve at this location. The same is as per the requirement of site.
@SuneelK99505031@cmohry@HaryanaPwd@mlkhattar उपरोक्त विषय के सन्दर्भ में सूचित किया जाता है कि इस सडक से सम्बन्धित एस्टीमेट आपके कार्यालय के पत्र क्रमांक न० 40879 दिंनाक 10.03.23 द्वारा लो०नि०वि० मुख्यालय चंडीगढ़ को भेजा जा चूका है जिसकी मंजूरी के बाद सडक निर्माण के कार्य को अतिशीघ्र शुरू कर दिया जायेगा |
@SandeepgGoyal @SuneelK99505031@HaryanaPwd The estimate for reconstruction of this stretch with PQC has been submitted to Govt for approval. The work can only be taken up after approval of the same which will take approx 3 months. Till that time the road shall be kept motor-able by filling the potholes with WBM material.
@kala_aibli@cmohry@mlkhattar@anilvijminister@Dchautala @dcmohry The tender has been invited for this road and the same will be received on 10.05.2023. Thereafter the work will be awarded to the agency and work will be started. It will take approx 45 days to start the work at site.