Let's talk about power quality management.
In this new case study, Brian Sennett and @Will__Hersey take a look at how our battery (BESS) solution not only delivers above-the-grid power, it also provides critical voltage support for high power transient loads ⚡
BESS can:
Power data centers through small disturbances that already exist on the grid, eliminating the need for IT loads to switch to UPS to maintain operation, which would cause a sudden loss of load to the grid
Act in grid-forming mode as a voltage source, aiding in flicker mitigation and voltage stability
Inject and absorb real power to counter power oscillations and achieve much lower resulting power ramp rates presented to the utility
We've implemented this at dozens of sites across the country 💪 and this will only get more important in today's grid-constrained environment.
We are LIVE from our latest site with Costco in Lawrence, Kansas! Brian Sennett, Manager of Hardware Engineering, shows off “The nerd zone” straight from the parking lot 🤓
We are hiring a Head of Corporate Development
You will own how Electric Era raises capital and how it turns strategic relationships into revenue, capabilities and scale
Posting below 👇
More options?
In the latest @Rivian update we got to see @ElectricEraTech chargers on the navigation screen. It would be nice to be able to filter by them on preferred networks.