Anson's projects in the Paradox Basin recognized as an area for additional lithium supply to broaden America's footprint in a Policy White Paper "The Strategic Lithium Reserve" published byRK Equity, a leading US based advisory firm specializing in lithium and critical minerals.
https://t.co/D2dNYv80jq
Would love to see more directors buying around this current SP of 5.7c $VSR Keen for drilling ti start soon. Heaps of cash and ready to go. #gallium prove starting to move up too #asx
Anson's drilling program at the Mt Fuel Skyline Geyser Well continues to move forward, angling a new well away from the original casing considered not to have been plugged correctly and too difficult to use as a re-entry well. Once distanced sufficiently from the original casing drilling to the target depth will commence. The most difficult part of establishing the parallel sidetracked well is nearing completion.
$VSR directors are buying more. This is looking to be a very good hold. I don’t think we will see levels this low for a while with all the projects and drilling in 2026 #asx#smallcaps#gallium#ree
$VSR just dropped major news: @Voltaic_VSR
✔️ 1.2km REE anomaly confirmed
✔️ Up to 843ppm TREO
✔️ 27% MREO magnet content
✔️ Now TWO large REE–Ga systems at Paddys Well
✔️ $7.9M in cash
This is turning into a big potential WA REE discovery play. #asx#ree#gallium
Anson has commenced the mobilization of the drilling rig that will be used to re-enter the Mt Fuel Skyline Geyser Well at the Green River Lithium Project, Utah, USA. The well head has been delivered and the large size drill rig is being delivered in pieces for assembly. The purpose of the re-entry program is to increase the JORC resource estimates.
Anson's re-entry program of the Mt Fuel Skyline Geyser well moving forward with a convoy of trucks delivering the drilling rig to site despite some rough road conditions caused by recent weather events. The large pieces of the rig are being assembled on site ready for the re-entry of the well to a depth of 11,000 feet (3.3km).
Anson completes the welding of the well head onto the existing casing at the Mt Fuel Skyline Geyser well at the Green River Lithium Projyect, Utah, USA. The progress of the re-entry program is on schedule.
Mineral deals getting signed with the #usa is fantastic for small caps like $VSR on the #asx exciting times ahead! Doesn’t take much money to get this beast moving fast @Voltaic_VSR
Anson has re-instated the road to Mt Fuel Skyline Geyser well after two recent flash floods and prepared the well cellar as part of the pre-drilling works. Final preparations for the drill rig arrival is underway.
Anson has completed the heat trace and insulation of all piping at the Green River Sample Demonstration Plant including the those to and from the Koch pilot plant. This will enable Anson to continue the test work being conducted with Koch Technology Solutions (KTS) over the next few months.